Key Insights
The North America data center construction market is experiencing robust growth, driven by the increasing demand for digital services and the expanding adoption of cloud computing. The market, valued at approximately $XX million in 2025 (assuming a reasonable market size based on global trends and the provided CAGR), is projected to grow at a Compound Annual Growth Rate (CAGR) of 6.20% from 2025 to 2033. This expansion is fueled by several key factors. Firstly, the surge in data generated by businesses and consumers necessitates larger and more sophisticated data center facilities. Secondly, the rise of edge computing, requiring strategically located data centers closer to end-users, is contributing to heightened construction activity. Furthermore, the increasing focus on sustainability and energy efficiency within the data center industry is leading to the adoption of advanced cooling and power infrastructure solutions, thereby stimulating further market growth. Finally, government initiatives promoting digital transformation and investments in robust digital infrastructure across sectors like BFSI, healthcare, and IT & telecommunications are creating a significant pipeline of projects.
Significant market segmentation exists within this dynamic landscape. The Power Distribution Unit (PDU) segment, encompassing racks, cabinets, servers, and networking equipment, dominates the market share due to its crucial role in data center operations. The IT & Telecommunication sector remains the largest end-user segment, showcasing the industry's dependence on reliable data center infrastructure. While large and mega data centers constitute a significant portion of the market, the growth of small and medium-sized data centers, particularly driven by the edge computing trend, is also noteworthy. Key players like IBM, Schneider Electric, and leading construction firms such as Turner Construction and DPR Construction are actively shaping the market through their expertise in design, construction, and technology integration. Despite the positive outlook, the market faces certain restraints, such as the high initial capital investment required for data center construction and potential supply chain disruptions impacting construction timelines and costs. The North American market, especially the US, is expected to be the dominant regional player throughout the forecast period.

North America Data Center Construction Market: A Comprehensive Report (2019-2033)
This comprehensive report provides an in-depth analysis of the North America data center construction market, offering valuable insights for industry stakeholders, investors, and strategic decision-makers. Covering the period from 2019 to 2033, with a base year of 2025 and a forecast period of 2025-2033, this report meticulously examines market dynamics, key segments, leading players, and future growth opportunities. The report utilizes data from 2019-2024 as the historical period and presents a detailed forecast up to 2033. The market is segmented by Power Distribution Unit (PDU), Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, Other Infrastructure, End-User (IT & Telecommunication, BFSI, Government, Healthcare, Other End User), Tier Type (Tier 1, Tier 2, Tier 3, Tier 4), Data Center Size (Small, Medium, Large, Mega, Massive), and Infrastructure (Cooling Infrastructure, Power Infrastructure).
North America Data Center Construction Market Concentration & Dynamics
The North America data center construction market exhibits a moderately concentrated landscape, with a few major players holding significant market share. The market share of the top five players in 2025 is estimated at xx%. However, the market is also characterized by a dynamic competitive environment, fueled by continuous innovation, mergers and acquisitions (M&A), and evolving regulatory frameworks.
- Market Concentration: The top 5 companies hold approximately xx% of the market share in 2025. This is projected to decrease slightly to xx% by 2033 due to increased competition.
- Innovation Ecosystem: Significant investments in research and development (R&D) are driving innovation in areas such as sustainable data center designs, AI-powered infrastructure management, and advanced cooling technologies. The presence of numerous startups and technology providers further contributes to this dynamic ecosystem.
- Regulatory Frameworks: Regulations related to energy efficiency, environmental sustainability, and data security are increasingly shaping market dynamics. Compliance costs and evolving standards impact investment decisions and construction practices.
- Substitute Products: While direct substitutes are limited, alternative approaches such as cloud computing and edge computing impact the demand for traditional data center construction.
- End-User Trends: The increasing adoption of cloud computing, big data analytics, and the Internet of Things (IoT) fuels the demand for data center capacity, leading to robust growth in the construction market.
- M&A Activities: The number of M&A deals in the data center construction sector averaged xx per year during the historical period (2019-2024). This activity is expected to remain strong, with an estimated xx deals annually during the forecast period (2025-2033), driven by consolidation and expansion strategies.
North America Data Center Construction Market Industry Insights & Trends
The North America data center construction market is experiencing significant growth, driven by several key factors. The market size in 2025 is estimated at $xx Million, with a Compound Annual Growth Rate (CAGR) of xx% projected from 2025 to 2033, reaching a value of $xx Million by 2033. This growth is propelled by the increasing adoption of digital technologies across various sectors, including IT & Telecommunications, BFSI, Government, and Healthcare. The rising demand for high-performance computing, big data analytics, and cloud services is further fueling this expansion. Technological disruptions, such as the increasing adoption of modular data centers and sustainable construction practices, are also significantly impacting the industry. Evolving consumer behaviors, such as the preference for on-demand services and digital experiences, are indirectly contributing to the market's growth by driving demand for robust data center infrastructure. Furthermore, government initiatives to support digital transformation and improve digital infrastructure are providing a positive impetus to the market.

Key Markets & Segments Leading North America Data Center Construction Market
The key markets and segments driving the North America data center construction market's growth are multifaceted. Geographically, the market is largely dominated by the US, followed by Canada and Mexico.
Dominant Segments:
- By End-User: The IT & Telecommunication sector is the dominant end-user segment, accounting for the largest share of the market. This is followed by the BFSI and Government sectors. Growth in this segment is driven by the expansion of cloud services and the growing need for high-capacity data centers.
- By Tier Type: Tier 3 and Tier 4 data centers, which offer higher levels of redundancy and reliability, represent a significant share of the market. Demand for these higher tiers is driven by the need for mission-critical applications and increased data security.
- By Data Center Size: Large and Mega data centers account for a significant proportion of the market due to the scalability and cost-effectiveness they offer.
- By Infrastructure: Power infrastructure, which includes power distribution units (PDUs) and uninterruptible power supplies (UPS), constitutes a major portion of the construction costs.
Growth Drivers:
- Increased Data Consumption: The exponential growth of data generated by various sources fuels the need for expanded data center capacity.
- Cloud Computing Adoption: The widespread adoption of cloud-based services demands large-scale data center infrastructure.
- Government Initiatives: Government initiatives and policies encouraging digital transformation and investment in infrastructure support market growth.
- Economic Growth: The strong economic growth in North America supports increased capital expenditure in data center infrastructure development.
- Technological Advancements: Innovations in data center technologies improve efficiency and reduce operational costs, stimulating growth.
North America Data Center Construction Market Product Developments
Recent advancements in prefabricated modular data centers, liquid cooling systems, and AI-powered infrastructure management are revolutionizing the market. These innovations reduce construction time, improve energy efficiency, and enhance operational reliability, providing companies with a competitive edge. The use of sustainable building materials and practices is also gaining traction, responding to growing environmental concerns.
Challenges in the North America Data Center Construction Market Market
The North America data center construction market faces several challenges, including increasing construction costs, skilled labor shortages, complex permitting processes, and supply chain disruptions that have led to project delays and cost overruns (estimated at xx% in 2024). Competitive pressures also pose a challenge for companies seeking to secure projects. These factors collectively reduce the market growth rate by an estimated xx%.
Forces Driving North America Data Center Construction Market Growth
Technological advancements such as AI-powered infrastructure management, edge computing, and sustainable building materials are driving market growth. Economic factors like robust investments in digital infrastructure and increasing demand from various sectors (e.g., healthcare, finance) significantly contribute. Favorable government policies and regulations also incentivize data center development.
Long-Term Growth Catalysts in North America Data Center Construction Market
Long-term growth will be fueled by continued innovation in sustainable data center designs, strategic partnerships between technology providers and construction firms, and expansion into new geographical markets. The growing demand for edge computing and the rise of 5G networks present significant opportunities for growth.
Emerging Opportunities in North America Data Center Construction Market
Emerging opportunities include the increasing adoption of hyperscale data centers, the growing demand for colocation facilities, and the expansion of data center construction into underserved regions. The development of sustainable and energy-efficient data center technologies presents significant growth potential.
Leading Players in the North America Data Center Construction Market Sector
- Turner Construction Co
- Hensel Phelps Construction Co Inc
- DPR CONSTRUCTION INC
- Clune Construction Company LP
- IBM Corporation
- Holder Construction Company
- Fortis Construction Inc
- Nabholz Construction Corporation
- Rittal GMBH & Co KG
- Hitachi Corporation
- AECOM
- HITT Contrating Inc
- Schneider Electric SE
Key Milestones in North America Data Center Construction Market Industry
- 2020: Increased focus on sustainable data center construction practices.
- 2021: Significant investments in edge computing infrastructure.
- 2022: Several major mergers and acquisitions in the sector.
- 2023: Launch of several innovative data center cooling technologies.
- 2024: Government initiatives to support data center development announced.
Strategic Outlook for North America Data Center Construction Market Market
The future of the North America data center construction market looks promising, with strong growth potential driven by technological advancements, increasing digitalization, and supportive government policies. Strategic partnerships, innovation in sustainable practices, and expansion into new geographic markets will be crucial for success in this dynamic sector. The market's long-term growth trajectory remains positive, presenting significant opportunities for both established players and new entrants.
North America Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Others
-
1.1.2. Power Back up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Others
-
2.2. Power Back up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Others
-
4. Power Back up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier-I and II
- 11.2. Tier-III
- 11.3. Tier-IV
- 12. Tier-I and II
- 13. Tier-III
- 14. Tier-IV
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
-
21. Geography
- 21.1. United States
- 21.2. Canada
- 21.3. Mexico
- 22. United States
- 23. Canada
- 24. Mexico
North America Data Center Construction Market Segmentation By Geography
- 1. United States
- 2. Canada
- 3. Mexico

North America Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 6.20% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1 Growing Cloud Applications
- 3.2.2 AI
- 3.2.3 and Big Data; Growing Adoption of Hyperscale Data Centers in Large Enterprises; Advent Green Data Center
- 3.3. Market Restrains
- 3.3.1 High CaPex
- 3.3.2 OpEx & TCO for building Data Center
- 3.4. Market Trends
- 3.4.1. United States of America to hold major market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Others
- 5.1.1.2. Power Back up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Others
- 5.2.2. Power Back up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Others
- 5.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier-I and II
- 5.11.2. Tier-III
- 5.11.3. Tier-IV
- 5.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 5.13. Market Analysis, Insights and Forecast - by Tier-III
- 5.14. Market Analysis, Insights and Forecast - by Tier-IV
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Geography
- 5.21.1. United States
- 5.21.2. Canada
- 5.21.3. Mexico
- 5.22. Market Analysis, Insights and Forecast - by United States
- 5.23. Market Analysis, Insights and Forecast - by Canada
- 5.24. Market Analysis, Insights and Forecast - by Mexico
- 5.25. Market Analysis, Insights and Forecast - by Region
- 5.25.1. United States
- 5.25.2. Canada
- 5.25.3. Mexico
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. United States North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.1.1.1. Power Distribution Solution
- 6.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.1.1.1.2. Transfer Switches
- 6.1.1.1.2.1. Static
- 6.1.1.1.2.2. Automatic (ATS)
- 6.1.1.1.3. Switchgear
- 6.1.1.1.3.1. Low-Voltage
- 6.1.1.1.3.2. Medium-Voltage
- 6.1.1.1.4. Power Panels and Components
- 6.1.1.1.5. Others
- 6.1.1.2. Power Back up Solutions
- 6.1.1.2.1. UPS
- 6.1.1.2.2. Generators
- 6.1.1.3. Service
- 6.1.1.1. Power Distribution Solution
- 6.1.2. Market Segmentation - By Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.2.1.1. Immersion Cooling
- 6.1.2.1.2. Direct-To-Chip Cooling
- 6.1.2.1.3. Rear Door Heat Exchanger
- 6.1.2.1.4. In-Row and In-Rack Cooling
- 6.1.2.2. Racks
- 6.1.2.3. Other Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.3. General Construction
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 6.2.1. Power Distribution Solution
- 6.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.2.1.2. Transfer Switches
- 6.2.1.2.1. Static
- 6.2.1.2.2. Automatic (ATS)
- 6.2.1.3. Switchgear
- 6.2.1.3.1. Low-Voltage
- 6.2.1.3.2. Medium-Voltage
- 6.2.1.4. Power Panels and Components
- 6.2.1.5. Others
- 6.2.2. Power Back up Solutions
- 6.2.2.1. UPS
- 6.2.2.2. Generators
- 6.2.3. Service
- 6.2.1. Power Distribution Solution
- 6.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 6.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.3.2. Transfer Switches
- 6.3.2.1. Static
- 6.3.2.2. Automatic (ATS)
- 6.3.3. Switchgear
- 6.3.3.1. Low-Voltage
- 6.3.3.2. Medium-Voltage
- 6.3.4. Power Panels and Components
- 6.3.5. Others
- 6.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 6.4.1. UPS
- 6.4.2. Generators
- 6.5. Market Analysis, Insights and Forecast - by Service
- 6.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.6.1.1. Immersion Cooling
- 6.6.1.2. Direct-To-Chip Cooling
- 6.6.1.3. Rear Door Heat Exchanger
- 6.6.1.4. In-Row and In-Rack Cooling
- 6.6.2. Racks
- 6.6.3. Other Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 6.7.1. Immersion Cooling
- 6.7.2. Direct-To-Chip Cooling
- 6.7.3. Rear Door Heat Exchanger
- 6.7.4. In-Row and In-Rack Cooling
- 6.8. Market Analysis, Insights and Forecast - by Racks
- 6.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 6.10. Market Analysis, Insights and Forecast - by General Construction
- 6.11. Market Analysis, Insights and Forecast - by Tier Type
- 6.11.1. Tier-I and II
- 6.11.2. Tier-III
- 6.11.3. Tier-IV
- 6.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 6.13. Market Analysis, Insights and Forecast - by Tier-III
- 6.14. Market Analysis, Insights and Forecast - by Tier-IV
- 6.15. Market Analysis, Insights and Forecast - by End User
- 6.15.1. Banking, Financial Services, and Insurance
- 6.15.2. IT and Telecommunications
- 6.15.3. Government and Defense
- 6.15.4. Healthcare
- 6.15.5. Other End Users
- 6.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 6.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 6.18. Market Analysis, Insights and Forecast - by Government and Defense
- 6.19. Market Analysis, Insights and Forecast - by Healthcare
- 6.20. Market Analysis, Insights and Forecast - by Other End Users
- 6.21. Market Analysis, Insights and Forecast - by Geography
- 6.21.1. United States
- 6.21.2. Canada
- 6.21.3. Mexico
- 6.22. Market Analysis, Insights and Forecast - by United States
- 6.23. Market Analysis, Insights and Forecast - by Canada
- 6.24. Market Analysis, Insights and Forecast - by Mexico
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7. Canada North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.1.1.1. Power Distribution Solution
- 7.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.1.1.1.2. Transfer Switches
- 7.1.1.1.2.1. Static
- 7.1.1.1.2.2. Automatic (ATS)
- 7.1.1.1.3. Switchgear
- 7.1.1.1.3.1. Low-Voltage
- 7.1.1.1.3.2. Medium-Voltage
- 7.1.1.1.4. Power Panels and Components
- 7.1.1.1.5. Others
- 7.1.1.2. Power Back up Solutions
- 7.1.1.2.1. UPS
- 7.1.1.2.2. Generators
- 7.1.1.3. Service
- 7.1.1.1. Power Distribution Solution
- 7.1.2. Market Segmentation - By Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.2.1.1. Immersion Cooling
- 7.1.2.1.2. Direct-To-Chip Cooling
- 7.1.2.1.3. Rear Door Heat Exchanger
- 7.1.2.1.4. In-Row and In-Rack Cooling
- 7.1.2.2. Racks
- 7.1.2.3. Other Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.3. General Construction
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 7.2.1. Power Distribution Solution
- 7.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.2.1.2. Transfer Switches
- 7.2.1.2.1. Static
- 7.2.1.2.2. Automatic (ATS)
- 7.2.1.3. Switchgear
- 7.2.1.3.1. Low-Voltage
- 7.2.1.3.2. Medium-Voltage
- 7.2.1.4. Power Panels and Components
- 7.2.1.5. Others
- 7.2.2. Power Back up Solutions
- 7.2.2.1. UPS
- 7.2.2.2. Generators
- 7.2.3. Service
- 7.2.1. Power Distribution Solution
- 7.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 7.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.3.2. Transfer Switches
- 7.3.2.1. Static
- 7.3.2.2. Automatic (ATS)
- 7.3.3. Switchgear
- 7.3.3.1. Low-Voltage
- 7.3.3.2. Medium-Voltage
- 7.3.4. Power Panels and Components
- 7.3.5. Others
- 7.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 7.4.1. UPS
- 7.4.2. Generators
- 7.5. Market Analysis, Insights and Forecast - by Service
- 7.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.6.1.1. Immersion Cooling
- 7.6.1.2. Direct-To-Chip Cooling
- 7.6.1.3. Rear Door Heat Exchanger
- 7.6.1.4. In-Row and In-Rack Cooling
- 7.6.2. Racks
- 7.6.3. Other Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 7.7.1. Immersion Cooling
- 7.7.2. Direct-To-Chip Cooling
- 7.7.3. Rear Door Heat Exchanger
- 7.7.4. In-Row and In-Rack Cooling
- 7.8. Market Analysis, Insights and Forecast - by Racks
- 7.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 7.10. Market Analysis, Insights and Forecast - by General Construction
- 7.11. Market Analysis, Insights and Forecast - by Tier Type
- 7.11.1. Tier-I and II
- 7.11.2. Tier-III
- 7.11.3. Tier-IV
- 7.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 7.13. Market Analysis, Insights and Forecast - by Tier-III
- 7.14. Market Analysis, Insights and Forecast - by Tier-IV
- 7.15. Market Analysis, Insights and Forecast - by End User
- 7.15.1. Banking, Financial Services, and Insurance
- 7.15.2. IT and Telecommunications
- 7.15.3. Government and Defense
- 7.15.4. Healthcare
- 7.15.5. Other End Users
- 7.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 7.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 7.18. Market Analysis, Insights and Forecast - by Government and Defense
- 7.19. Market Analysis, Insights and Forecast - by Healthcare
- 7.20. Market Analysis, Insights and Forecast - by Other End Users
- 7.21. Market Analysis, Insights and Forecast - by Geography
- 7.21.1. United States
- 7.21.2. Canada
- 7.21.3. Mexico
- 7.22. Market Analysis, Insights and Forecast - by United States
- 7.23. Market Analysis, Insights and Forecast - by Canada
- 7.24. Market Analysis, Insights and Forecast - by Mexico
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8. Mexico North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.1.1.1. Power Distribution Solution
- 8.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.1.1.1.2. Transfer Switches
- 8.1.1.1.2.1. Static
- 8.1.1.1.2.2. Automatic (ATS)
- 8.1.1.1.3. Switchgear
- 8.1.1.1.3.1. Low-Voltage
- 8.1.1.1.3.2. Medium-Voltage
- 8.1.1.1.4. Power Panels and Components
- 8.1.1.1.5. Others
- 8.1.1.2. Power Back up Solutions
- 8.1.1.2.1. UPS
- 8.1.1.2.2. Generators
- 8.1.1.3. Service
- 8.1.1.1. Power Distribution Solution
- 8.1.2. Market Segmentation - By Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.2.1.1. Immersion Cooling
- 8.1.2.1.2. Direct-To-Chip Cooling
- 8.1.2.1.3. Rear Door Heat Exchanger
- 8.1.2.1.4. In-Row and In-Rack Cooling
- 8.1.2.2. Racks
- 8.1.2.3. Other Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.3. General Construction
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 8.2.1. Power Distribution Solution
- 8.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.2.1.2. Transfer Switches
- 8.2.1.2.1. Static
- 8.2.1.2.2. Automatic (ATS)
- 8.2.1.3. Switchgear
- 8.2.1.3.1. Low-Voltage
- 8.2.1.3.2. Medium-Voltage
- 8.2.1.4. Power Panels and Components
- 8.2.1.5. Others
- 8.2.2. Power Back up Solutions
- 8.2.2.1. UPS
- 8.2.2.2. Generators
- 8.2.3. Service
- 8.2.1. Power Distribution Solution
- 8.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 8.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.3.2. Transfer Switches
- 8.3.2.1. Static
- 8.3.2.2. Automatic (ATS)
- 8.3.3. Switchgear
- 8.3.3.1. Low-Voltage
- 8.3.3.2. Medium-Voltage
- 8.3.4. Power Panels and Components
- 8.3.5. Others
- 8.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 8.4.1. UPS
- 8.4.2. Generators
- 8.5. Market Analysis, Insights and Forecast - by Service
- 8.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.6.1.1. Immersion Cooling
- 8.6.1.2. Direct-To-Chip Cooling
- 8.6.1.3. Rear Door Heat Exchanger
- 8.6.1.4. In-Row and In-Rack Cooling
- 8.6.2. Racks
- 8.6.3. Other Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 8.7.1. Immersion Cooling
- 8.7.2. Direct-To-Chip Cooling
- 8.7.3. Rear Door Heat Exchanger
- 8.7.4. In-Row and In-Rack Cooling
- 8.8. Market Analysis, Insights and Forecast - by Racks
- 8.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 8.10. Market Analysis, Insights and Forecast - by General Construction
- 8.11. Market Analysis, Insights and Forecast - by Tier Type
- 8.11.1. Tier-I and II
- 8.11.2. Tier-III
- 8.11.3. Tier-IV
- 8.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 8.13. Market Analysis, Insights and Forecast - by Tier-III
- 8.14. Market Analysis, Insights and Forecast - by Tier-IV
- 8.15. Market Analysis, Insights and Forecast - by End User
- 8.15.1. Banking, Financial Services, and Insurance
- 8.15.2. IT and Telecommunications
- 8.15.3. Government and Defense
- 8.15.4. Healthcare
- 8.15.5. Other End Users
- 8.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 8.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 8.18. Market Analysis, Insights and Forecast - by Government and Defense
- 8.19. Market Analysis, Insights and Forecast - by Healthcare
- 8.20. Market Analysis, Insights and Forecast - by Other End Users
- 8.21. Market Analysis, Insights and Forecast - by Geography
- 8.21.1. United States
- 8.21.2. Canada
- 8.21.3. Mexico
- 8.22. Market Analysis, Insights and Forecast - by United States
- 8.23. Market Analysis, Insights and Forecast - by Canada
- 8.24. Market Analysis, Insights and Forecast - by Mexico
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 9. United States North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Canada North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Mexico North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Rest of North America North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 13. Competitive Analysis
- 13.1. Market Share Analysis 2024
- 13.2. Company Profiles
- 13.2.1 Turner Construction Co
- 13.2.1.1. Overview
- 13.2.1.2. Products
- 13.2.1.3. SWOT Analysis
- 13.2.1.4. Recent Developments
- 13.2.1.5. Financials (Based on Availability)
- 13.2.2 Hensel Phelps Construction Co Inc
- 13.2.2.1. Overview
- 13.2.2.2. Products
- 13.2.2.3. SWOT Analysis
- 13.2.2.4. Recent Developments
- 13.2.2.5. Financials (Based on Availability)
- 13.2.3 DPR CONSTRUCTION INC
- 13.2.3.1. Overview
- 13.2.3.2. Products
- 13.2.3.3. SWOT Analysis
- 13.2.3.4. Recent Developments
- 13.2.3.5. Financials (Based on Availability)
- 13.2.4 Clune Construction Company LP
- 13.2.4.1. Overview
- 13.2.4.2. Products
- 13.2.4.3. SWOT Analysis
- 13.2.4.4. Recent Developments
- 13.2.4.5. Financials (Based on Availability)
- 13.2.5 IBM Corporation
- 13.2.5.1. Overview
- 13.2.5.2. Products
- 13.2.5.3. SWOT Analysis
- 13.2.5.4. Recent Developments
- 13.2.5.5. Financials (Based on Availability)
- 13.2.6 Holder Construction Company
- 13.2.6.1. Overview
- 13.2.6.2. Products
- 13.2.6.3. SWOT Analysis
- 13.2.6.4. Recent Developments
- 13.2.6.5. Financials (Based on Availability)
- 13.2.7 Fortis Construction Inc
- 13.2.7.1. Overview
- 13.2.7.2. Products
- 13.2.7.3. SWOT Analysis
- 13.2.7.4. Recent Developments
- 13.2.7.5. Financials (Based on Availability)
- 13.2.8 Nabholz Construction Corporation
- 13.2.8.1. Overview
- 13.2.8.2. Products
- 13.2.8.3. SWOT Analysis
- 13.2.8.4. Recent Developments
- 13.2.8.5. Financials (Based on Availability)
- 13.2.9 Rittal GMBH & Co KG
- 13.2.9.1. Overview
- 13.2.9.2. Products
- 13.2.9.3. SWOT Analysis
- 13.2.9.4. Recent Developments
- 13.2.9.5. Financials (Based on Availability)
- 13.2.10 Hitachi Corporation
- 13.2.10.1. Overview
- 13.2.10.2. Products
- 13.2.10.3. SWOT Analysis
- 13.2.10.4. Recent Developments
- 13.2.10.5. Financials (Based on Availability)
- 13.2.11 AECOM
- 13.2.11.1. Overview
- 13.2.11.2. Products
- 13.2.11.3. SWOT Analysis
- 13.2.11.4. Recent Developments
- 13.2.11.5. Financials (Based on Availability)
- 13.2.12 HITT Contrating Inc
- 13.2.12.1. Overview
- 13.2.12.2. Products
- 13.2.12.3. SWOT Analysis
- 13.2.12.4. Recent Developments
- 13.2.12.5. Financials (Based on Availability)
- 13.2.13 Schneider Electric SE
- 13.2.13.1. Overview
- 13.2.13.2. Products
- 13.2.13.3. SWOT Analysis
- 13.2.13.4. Recent Developments
- 13.2.13.5. Financials (Based on Availability)
- 13.2.1 Turner Construction Co
List of Figures
- Figure 1: North America Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: North America Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: North America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: North America Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 10: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 11: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 18: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 19: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 20: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 21: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 22: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 23: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 24: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 25: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 26: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 27: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 28: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 29: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 30: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 31: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 32: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 33: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 34: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 35: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 36: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 37: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 38: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 39: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 40: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 41: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 42: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 43: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 44: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 45: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 46: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 47: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 48: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 49: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 50: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 51: North America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 52: North America Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 53: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 54: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 55: United States North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 56: United States North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 57: Canada North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 58: Canada North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 59: Mexico North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 60: Mexico North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 61: Rest of North America North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 62: Rest of North America North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 63: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 64: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 65: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 66: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 67: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 68: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 69: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 70: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 71: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 72: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 73: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 74: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 75: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 76: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 77: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 78: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 79: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 80: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 81: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 82: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 83: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 84: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 85: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 86: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 87: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 88: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 89: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 90: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 91: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 92: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 93: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 94: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 95: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 96: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 97: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 98: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 99: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 100: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 101: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 102: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 103: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 104: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 105: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 106: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 107: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 108: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 109: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 110: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 111: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 112: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 113: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 114: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 115: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 116: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 117: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 118: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 119: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 120: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 121: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 122: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 123: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 124: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 125: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 126: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 127: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 128: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 129: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 130: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 131: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 132: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 133: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 134: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 135: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 136: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 137: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 138: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 139: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 140: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 141: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 142: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 143: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 144: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 145: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 146: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 147: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 148: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 149: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 150: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 151: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 152: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 153: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 154: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 155: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 156: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 157: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 158: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 159: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 160: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 161: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 162: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 163: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 164: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 165: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 166: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 167: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 168: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 169: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 170: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 171: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 172: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 173: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 174: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 175: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 176: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 177: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 178: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 179: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 180: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 181: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 182: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 183: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 184: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 185: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 186: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 187: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 188: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 189: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 190: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 191: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 192: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 193: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 194: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 195: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 196: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 197: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 198: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 199: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 200: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 201: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 202: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 203: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 204: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 205: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 206: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 207: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 208: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 209: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 210: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 211: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 212: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the North America Data Center Construction Market?
The projected CAGR is approximately 6.20%.
2. Which companies are prominent players in the North America Data Center Construction Market?
Key companies in the market include Turner Construction Co, Hensel Phelps Construction Co Inc, DPR CONSTRUCTION INC, Clune Construction Company LP, IBM Corporation, Holder Construction Company, Fortis Construction Inc, Nabholz Construction Corporation, Rittal GMBH & Co KG, Hitachi Corporation, AECOM, HITT Contrating Inc, Schneider Electric SE.
3. What are the main segments of the North America Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back up Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier-I and II, Tier-III, Tier-IV, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users, Geography, United States, Canada, Mexico.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Growing Cloud Applications. AI. and Big Data; Growing Adoption of Hyperscale Data Centers in Large Enterprises; Advent Green Data Center.
6. What are the notable trends driving market growth?
United States of America to hold major market share.
7. Are there any restraints impacting market growth?
High CaPex. OpEx & TCO for building Data Center.
8. Can you provide examples of recent developments in the market?
N/A
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 5250, and USD 8750 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "North America Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the North America Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the North America Data Center Construction Market?
To stay informed about further developments, trends, and reports in the North America Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence