Key Insights
The Thailand data center construction market is experiencing robust growth, driven by the increasing adoption of cloud computing, digital transformation initiatives across various sectors, and the burgeoning e-commerce landscape. A Compound Annual Growth Rate (CAGR) of 12.53% from 2019 to 2024 suggests a significant market expansion. This growth is fueled by substantial investments from both domestic and international players, particularly in strategically located Tier 1 and Tier 2 cities offering robust infrastructure and connectivity. The IT & Telecommunication sector leads demand, followed by the BFSI and government sectors, all actively deploying data centers to support their expanding digital operations. Growth is further propelled by trends like edge computing, which necessitates distributed data center deployments closer to end-users, and the rising need for enhanced data security and disaster recovery solutions. While the market faces challenges such as high land costs and potential power shortages in certain areas, these are being addressed by innovative approaches to infrastructure development and power management, including renewable energy integration. The expanding market is segmented across end-user industries, infrastructure types (electrical and mechanical), data center size (small to mega), and tier type (Tier 1 & Tier 2). Key players like Space DC Pte Ltd, Equinix Inc, and several regional operators are actively shaping the market dynamics.
Looking ahead to 2033, the market's trajectory indicates continued expansion, driven by sustained economic growth and government initiatives promoting digitalization in Thailand. The construction of larger-scale, highly efficient data centers is anticipated, aligning with global trends toward hyperscale infrastructure. The increasing focus on sustainability will also impact the market, favoring data center designs incorporating energy-efficient technologies and renewable energy sources. The competitive landscape will likely see consolidation and increased investment in cutting-edge technologies such as AI and machine learning, further driving innovation and expansion within the Thailand data center construction market. The diverse range of players, from international giants to local companies, signifies a dynamic and competitive market poised for significant future growth.

Thailand Data Center Construction Market: A Comprehensive Report (2019-2033)
This comprehensive report provides an in-depth analysis of the Thailand data center construction market, offering invaluable insights for investors, industry stakeholders, and strategic decision-makers. Covering the period from 2019 to 2033, with a base year of 2025 and a forecast period spanning 2025-2033, this report meticulously examines market dynamics, growth drivers, key segments, and leading players. Uncover crucial data on market size (in Millions), CAGR, and future projections, enabling informed strategic planning and investment decisions.
Thailand Data Center Construction Market Market Concentration & Dynamics
This section analyzes the competitive landscape of the Thailand data center construction market, evaluating market concentration, innovation, regulatory frameworks, and market dynamics. The report examines the market share of key players such as Space DC Pte Ltd, Equinix Inc, and NTT Communications Corporation, alongside emerging players. Furthermore, it assesses the impact of mergers and acquisitions (M&A) activities on market consolidation. The analysis includes:
- Market Concentration: The market is characterized by [describe market concentration - e.g., moderate concentration with a few dominant players and several smaller players]. The top 5 players hold approximately xx% of the market share in 2025, with [mention any specific market share data available].
- Innovation Ecosystems: The report identifies key innovation hubs and collaborative initiatives fostering technological advancements within the sector. [Describe the innovation ecosystem, e.g., presence of research institutions, startups, etc.].
- Regulatory Frameworks: Analysis of existing regulations and their influence on market growth, including licensing requirements, environmental regulations, and data privacy laws. [Describe the regulatory environment and its impact].
- Substitute Products: Assessment of potential substitute technologies or solutions that could impact market growth. [Discuss potential substitutes and their market impact].
- End-User Trends: Analysis of evolving data center requirements across key end-user segments, including IT & Telecommunication, BFSI, Government, and Healthcare. [Describe trends like cloud adoption, data growth etc. and their impact on demand].
- M&A Activities: The report documents xx M&A deals in the historical period (2019-2024), indicating [e.g., a consolidating market, increased competition, etc.]. The forecast period anticipates xx M&A deals driven by [mention reasons].
Thailand Data Center Construction Market Industry Insights & Trends
This section delves into the key drivers and trends shaping the Thailand data center construction market's growth trajectory. The market size in 2025 is estimated at xx Million, projected to reach xx Million by 2033, exhibiting a CAGR of xx%. Several factors contribute to this growth, including:
- Rapid Digitalization: The increasing adoption of digital technologies across various sectors fuels the demand for robust data center infrastructure.
- Government Initiatives: Supportive government policies and investments in digital infrastructure are stimulating market expansion.
- Cloud Computing Growth: The expanding cloud computing market in Thailand drives the need for scalable and reliable data center facilities.
- Technological Advancements: Innovations in data center technologies, such as AI and edge computing, further enhance market growth.
- [Add other relevant trends and drivers with quantifiable data if available. ]

Key Markets & Segments Leading Thailand Data Center Construction Market
This section analyzes the dominant segments within the Thailand data center construction market.
By End User: The IT & Telecommunication sector is the leading end-user segment, accounting for xx% of the market in 2025, followed by BFSI at xx%. Growth in these sectors is driven by:
- IT & Telecommunication: Increasing data traffic, expansion of 5G networks, and growing demand for cloud services.
- BFSI: Stringent regulatory compliance requirements and the need for secure data storage.
- Government: Initiatives to improve digital governance and public services.
- Healthcare: Increasing adoption of electronic health records (EHRs) and telehealth services.
By Infrastructure: Electrical infrastructure represents the largest share of the market, with mechanical infrastructure following closely behind. This is driven by:
- Power Requirements: High power consumption needs of data centers necessitate robust electrical infrastructure.
- Cooling Systems: The need for efficient cooling systems to maintain optimal operating temperatures.
By DC Size: The market is dominated by [mention size - e.g., Medium and Large] data centers, reflecting the diverse needs of various end-users.
By Tier Type: Tier III and Tier IV data centers are gaining traction due to their high reliability and redundancy features.
Thailand Data Center Construction Market Product Developments
The Thailand data center construction market is witnessing significant product innovations, primarily focused on enhancing energy efficiency, scalability, and security. Advancements in modular data center designs, AI-powered monitoring systems, and green technologies are creating competitive advantages for companies. The adoption of sustainable practices, like renewable energy sources, is also becoming increasingly crucial.
Challenges in the Thailand Data Center Construction Market Market
The Thailand data center construction market faces several challenges, including:
- Land Acquisition: Securing suitable land for data center construction can be complex and expensive.
- Power Supply: Ensuring reliable and sufficient power supply remains a key challenge.
- Skilled Labor: A shortage of skilled labor can hamper project timelines and quality.
- Competition: Increasing competition from both domestic and international players puts pressure on margins.
These challenges impact market growth by [quantify the impact, e.g., causing project delays, increasing costs, etc.].
Forces Driving Thailand Data Center Construction Market Growth
Several factors are driving the growth of the Thailand data center construction market:
- Government Support: Government initiatives promoting digitalization and investment in digital infrastructure.
- Economic Growth: Thailand's growing economy fuels the demand for IT services and data storage.
- Technological Advancements: Innovation in data center technologies enhances efficiency and scalability.
- Foreign Investment: Increased foreign investment in the sector is boosting market capacity.
These factors contribute to a positive outlook for the market's future growth.
Long-Term Growth Catalysts in Thailand Data Center Construction Market
Long-term growth will be propelled by continuous innovation in cooling technologies, increased adoption of renewable energy sources, and strategic partnerships between data center operators and technology providers. Expansion into new geographical areas and the development of specialized data centers for specific industries (e.g., healthcare, finance) will also fuel growth.
Emerging Opportunities in Thailand Data Center Construction Market
Emerging opportunities include the growth of edge data centers, the increasing adoption of hyperscale data centers, and the development of data center clusters in strategic locations. The demand for sustainable data centers and the integration of AI and IoT technologies offer further opportunities for market expansion.
Leading Players in the Thailand Data Center Construction Market Sector
- Space DC Pte Ltd
- DTPNet
- Project Planning Service
- NTT Communications Corporation
- XL Axiata Tbk PT (Princeton Digital Group)
- Equinix Inc
- Telkomsigma
- GTN Data Center
- TAKNET Systems (Thailand ) Co Ltd
- Arup Group
- Lintasarta
- PT DCI Indonesia (DCI)
- Biznet Networks
- JupiterDC
- PT Faasri Utama Sakti
- Gulf Energy Development Public Company Limited
- Delta Electronics (Thailand)
- Indosat Tbk PT
Key Milestones in Thailand Data Center Construction Market Industry
- February 2023: Singapore Telecom Limited (Singtel), Gulf Energy Development PLC (Gulf), and Advanced Info Services PLC (AIS) announced a joint venture to build a 20 MW capacity data center in Thailand by 2025, to be operated by GSA Data Center Company Limited (GSA). This signifies a significant investment in large-scale data center infrastructure to meet the growing demands of cloud providers.
Strategic Outlook for Thailand Data Center Construction Market Market
The Thailand data center construction market exhibits strong growth potential, driven by increasing digitalization, supportive government policies, and substantial foreign investment. Strategic opportunities exist for companies focusing on sustainable solutions, advanced technologies, and strategic partnerships. The market is poised for significant expansion in the coming years, presenting lucrative prospects for investors and industry players.
Thailand Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Distribution Solutions
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Distribution Solutions
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 2 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 2 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
Thailand Data Center Construction Market Segmentation By Geography
- 1. Thailand

Thailand Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 12.53% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 9.1 Migration to Cloud by large businesses9.2 Established 'Mobile-First' Landscape Since the Recent Past
- 3.3. Market Restrains
- 3.3.1. 10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors
- 3.4. Market Trends
- 3.4.1. Tier 3 is the Largest Tier Type
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Thailand Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Distribution Solutions
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Distribution Solutions
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 2 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 2 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. Thailand
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Space DC Pte Ltd
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 DTPNet
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Project Planning Service
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 NTT Communications Corporation
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 XL Axiata Tbk PT (Princeton Digital Group)
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Equinix Inc
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Telkomsigma
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 GTN Data Center
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 TAKNET Systems (Thailand ) Co Ltd
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Arup Group
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Lintasarta
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 PT DCI Indonesia (DCI)
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 Biznet Networks
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 JupiterDC
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 PT Faasri Utama Sakti
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 Gulf Energy Development Public Company Limited
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 Delta Electronics (Thailand)
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.18 Indosat Tbk PT
- 6.2.18.1. Overview
- 6.2.18.2. Products
- 6.2.18.3. SWOT Analysis
- 6.2.18.4. Recent Developments
- 6.2.18.5. Financials (Based on Availability)
- 6.2.1 Space DC Pte Ltd
List of Figures
- Figure 1: Thailand Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Thailand Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Thailand Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Thailand Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Thailand Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Thailand Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Thailand Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Thailand Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Thailand Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Thailand Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Thailand Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Thailand Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Thailand Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Thailand Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 2 and 2 2019 & 2032
- Table 14: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 15: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 16: Thailand Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Thailand Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Thailand Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Thailand Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Thailand Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Thailand Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Thailand Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 23: Thailand Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 24: Thailand Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 25: Thailand Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 26: Thailand Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 27: Thailand Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 28: Thailand Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 29: Thailand Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 30: Thailand Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 31: Thailand Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 32: Thailand Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 33: Thailand Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 34: Thailand Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 35: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 2 and 2 2019 & 2032
- Table 36: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 37: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 38: Thailand Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 39: Thailand Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 40: Thailand Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 41: Thailand Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 42: Thailand Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 43: Thailand Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 44: Thailand Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Thailand Data Center Construction Market?
The projected CAGR is approximately 12.53%.
2. Which companies are prominent players in the Thailand Data Center Construction Market?
Key companies in the market include Space DC Pte Ltd, DTPNet, Project Planning Service, NTT Communications Corporation, XL Axiata Tbk PT (Princeton Digital Group), Equinix Inc, Telkomsigma, GTN Data Center, TAKNET Systems (Thailand ) Co Ltd, Arup Group, Lintasarta, PT DCI Indonesia (DCI), Biznet Networks, JupiterDC, PT Faasri Utama Sakti, Gulf Energy Development Public Company Limited, Delta Electronics (Thailand), Indosat Tbk PT.
3. What are the main segments of the Thailand Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 2 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
9.1 Migration to Cloud by large businesses9.2 Established 'Mobile-First' Landscape Since the Recent Past.
6. What are the notable trends driving market growth?
Tier 3 is the Largest Tier Type.
7. Are there any restraints impacting market growth?
10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors.
8. Can you provide examples of recent developments in the market?
February 2023:Singapore Telecom Limited (Singtel), Gulf Energy Development PLC (Gulf), and Advanced Info Services PLC (AIS), established a joint venture to build a 20 MW capacity data center in Thailand by 2025. This facility will be operated by GSA Data Center Company Limited (GSA). The company aims to match the large-scale data center requirements of cloud players in the country.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Thailand Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Thailand Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Thailand Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Thailand Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence