Key Insights
The Israel data center construction market exhibits robust growth, driven by the burgeoning digital economy and increasing demand for cloud computing and colocation services. The market's compound annual growth rate (CAGR) of 9.55% from 2019 to 2024 suggests a significant expansion, projected to continue into the forecast period (2025-2033). Key drivers include the government's initiatives to foster technological advancement, the rise of hyperscale data centers, and the expanding adoption of 5G technology. The IT & Telecommunication sector is a major end-user, followed by BFSI (Banking, Financial Services, and Insurance) and Government sectors, all contributing to the substantial infrastructure investment required. The market is segmented by infrastructure type (electrical and mechanical) and end-user, reflecting diverse construction needs. Leading companies, including ABB Ltd, Schneider Electric SE, and Delta Group, are actively involved, leveraging their expertise in electrical and mechanical infrastructure solutions. Challenges include land scarcity and high construction costs, potentially impacting market expansion. However, the sustained growth in data consumption and the strategic importance of data centers within the national infrastructure are expected to outweigh these restraints.
Considering a base year market size of approximately $100 million in 2025 (an estimated figure based on typical market sizes for similar economies and the given CAGR), the market is poised for considerable growth. This expansion reflects Israel's strong technological focus, increasing investments in digital infrastructure, and the nation’s role as a regional technology hub. The ongoing expansion of hyperscale data centers, driven by global cloud providers, will further fuel demand for specialized construction services and sophisticated infrastructure solutions. The market’s segmentation allows for a nuanced understanding of specific construction requirements, enabling targeted investments and strategic partnerships across the value chain. Future growth will depend on sustained government support for digital infrastructure development, alongside the continued evolution of technological advancements and the overall growth of data-intensive industries within Israel.

Israel Data Center Construction Market: A Comprehensive Report (2019-2033)
This comprehensive report provides an in-depth analysis of the Israel Data Center Construction Market, offering valuable insights for industry stakeholders, investors, and strategic planners. Spanning the period from 2019 to 2033 (Study Period), with a focus on 2025 (Base Year and Estimated Year), and forecasting to 2033 (Forecast Period), this report leverages data from the historical period (2019-2024) to deliver actionable intelligence. The report meticulously examines market size, growth drivers, competitive landscape, and emerging trends, equipping readers to navigate the dynamic complexities of this crucial sector.
Israel Data Center Construction Market Market Concentration & Dynamics
The Israel data center construction market exhibits a moderately concentrated landscape, with several large multinational players alongside a number of regional specialists. Market share analysis reveals that [Insert xx%] of the market is controlled by the top five players, indicating a competitive but not overly dominant market structure. Innovation in this sector is driven by a robust ecosystem comprising technology providers, construction firms, and government initiatives promoting digital infrastructure development. The regulatory framework, while generally supportive of data center growth, faces ongoing challenges in areas such as permitting and environmental compliance. Substitute products, such as cloud-based services, exert competitive pressure, although the demand for on-premise data center solutions remains significant, particularly for sectors requiring high levels of data security and low latency. End-user trends indicate a strong preference for energy-efficient and resilient infrastructure, fostering innovation in sustainable data center design and construction. Mergers and acquisitions (M&A) activity has been noteworthy. Recent deal counts indicate a [Insert xx] number of significant M&A transactions during the historical period, primarily driven by expansion strategies and consolidation within the sector.
- Market Share: Top 5 players hold approximately [Insert xx]% of market share.
- M&A Activity: [Insert xx] significant deals in the past [Insert xx] years.
- Innovation: Focus on energy efficiency and sustainable practices.
- Regulatory Landscape: Ongoing evolution of permitting and environmental regulations.
Israel Data Center Construction Market Industry Insights & Trends
The Israel data center construction market is experiencing robust growth, driven by the nation’s burgeoning technological sector, robust investment in digital infrastructure, and increasing demand for cloud services and data storage. The market size in 2025 is estimated at [Insert xx Million USD], exhibiting a Compound Annual Growth Rate (CAGR) of [Insert xx]% during the forecast period (2025-2033). This growth is further fueled by the rising adoption of big data analytics, artificial intelligence, and the Internet of Things (IoT), all of which necessitate enhanced data center capabilities. However, technological disruptions, such as the emergence of edge computing, present both challenges and opportunities, demanding adaptable construction methodologies and infrastructure solutions. Evolving consumer behavior, specifically the increased reliance on digital services across diverse sectors, continues to underpin the sustained expansion of the data center construction market. The growth trajectory is projected to remain positive, with [Insert xx Million USD] in revenue projected for 2033.

Key Markets & Segments Leading Israel Data Center Construction Market
The IT & Telecommunication sector is the dominant end-user segment in the Israeli data center construction market, owing to the strong presence of technology companies and the escalating demand for high-performance computing infrastructure. This segment accounts for [Insert xx]% of the total market. The BFSI sector follows closely, driven by the need for robust data security and reliable transaction processing.
Key Drivers:
- Economic Growth: Israel's robust economy fuels demand for advanced digital services.
- Government Initiatives: Government support for digital infrastructure development.
- Technological Advancements: The widespread adoption of cloud computing and big data.
Dominance Analysis:
The Tel Aviv metropolitan area, encompassing key business hubs and technological centers, is the dominant region for data center construction activity, owing to its established infrastructure, skilled workforce, and proximity to major clients. Other significant regions include Jerusalem and Haifa, particularly attracting government and research-focused projects. The Electrical Infrastructure segment holds a significant market share, exceeding [Insert xx]%, due to the critical nature of power supply and distribution within data centers. Mechanical infrastructure also plays a vital role, focusing on climate control and other essential environmental needs.
Israel Data Center Construction Market Product Developments
Recent advancements in prefabricated modular data center designs and sustainable construction materials are revolutionizing the industry. These innovations reduce construction time, enhance efficiency, and improve energy savings. The focus on modularity also improves scalability and flexibility, meeting the fluctuating requirements of data centers. This trend is likely to further accelerate the market's growth and enhance competitive dynamics.
Challenges in the Israel Data Center Construction Market Market
Significant challenges include land scarcity and high construction costs in prime locations, creating limitations for expansion. Furthermore, obtaining necessary permits and approvals can be time-consuming, delaying project timelines and increasing costs. The sector also faces global supply chain disruptions, impacting the availability of key components and materials, and leading to potential cost increases and project delays. Intense competition from established and emerging players exerts further pressure on margins. For instance, supply chain issues in 2022 resulted in a [Insert xx]% increase in project costs for certain data center builds.
Forces Driving Israel Data Center Construction Market Growth
Technological advancements such as AI, IoT, and 5G are key drivers. The government's commitment to fostering a robust digital economy, along with supportive regulatory frameworks, accelerates growth. The increasing adoption of cloud services and big data analytics creates continuous demand for data center space and advanced infrastructure. These are major growth catalysts for the sector.
Challenges in the Israel Data Center Construction Market Market (Long-term Growth Catalysts)
Long-term growth will be driven by innovation in sustainable technologies, such as green energy integration and water-cooling systems. Strategic partnerships between technology providers and construction firms enhance efficiency and offer cost-effective solutions. Market expansion into secondary cities and regions will further contribute to sustained growth, leveraging cheaper land and resources.
Emerging Opportunities in Israel Data Center Construction Market
The emergence of edge computing creates significant opportunities for specialized data center construction near end-users. Hyper-scale data centers, catering to major cloud providers, present considerable growth prospects. Increased focus on data security and resilience will continue driving demand for advanced security systems and robust infrastructure designs, creating further opportunities within the market.
Leading Players in the Israel Data Center Construction Market Sector
- ABB Ltd
- Fortis Construction
- STULZ GMBH
- Saan Zahav
- Delta Group
- Schneider Electric SE
- Turner Construction Co
- DPR Construction Inc
- Caterpillar Inc
- Rittal GmbH & Co KG
- Delta Electronics
- STULZ GMB
- Mercury Engineering
- AECOM Limited
- Legrand
- CyrusOne Inc
- AECOM
- Canovate Group
- EAE Group
- Alfa Laval AB
- M+W Group (Exyte)
Key Milestones in Israel Data Center Construction Market Industry
- July 2022: Berkshire Partners' acquisition of a 49% stake in MedOne for USD 215 Million, signifying significant investor confidence in the Israeli data center market.
- August 2021: EdgeConneX's acquisition of Global Data Center (GDC), expanding its footprint in Israel with two new facilities, highlighting consolidation trends and increased capacity.
Strategic Outlook for Israel Data Center Construction Market Market
The Israel data center construction market presents a highly promising outlook, characterized by consistent growth fueled by technological advancements, supportive government policies, and robust private investment. Strategic opportunities exist in focusing on sustainable and resilient infrastructure, leveraging modular designs for faster deployments, and expanding into emerging regions. The market is poised for continued expansion and presents attractive prospects for established and emerging players alike.
Israel Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Panels and Components
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Ba
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-voltage
- 2.1.3.2. Medium-voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Panels and Components
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Ba
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-voltage
- 3.3.2. Medium-voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Panels and Components
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-to-chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-row and In-rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-to-chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-row and In-rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 1 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 1 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
Israel Data Center Construction Market Segmentation By Geography
- 1. Israel

Israel Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 9.55% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 9.1 Rising Adoption of Renewable Energy Sources9.2 Increase in 5G Deployments Fueling Edge Data Center Investments9.3 Smart City Initiatives Driving Data Center Investments
- 3.3. Market Restrains
- 3.3.1. 10.1 Security Challenges in Data Centers10.2 Location Constraints on the Development of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Israel Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Panels and Components
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Ba
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-voltage
- 5.2.1.3.2. Medium-voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Panels and Components
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Ba
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-voltage
- 5.3.3.2. Medium-voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Panels and Components
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-to-chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-row and In-rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-to-chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-row and In-rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 1 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. Israel
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 ABB Ltd
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Fortis Construction
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 STULZ GMBH
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 Saan Zahav
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 Delta Group
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Schneider Electric SE
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Turner Construction Co
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 DPR Construction Inc
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 Caterpillar Inc
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Rittal GmbH & Co KG
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Delta Electronics
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 STULZ GMB
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 Mercury Engineering
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 AECOM Limited
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 Legrand
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 CyrusOne Inc
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 AECOM
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.18 Canovate Group
- 6.2.18.1. Overview
- 6.2.18.2. Products
- 6.2.18.3. SWOT Analysis
- 6.2.18.4. Recent Developments
- 6.2.18.5. Financials (Based on Availability)
- 6.2.19 EAE Group
- 6.2.19.1. Overview
- 6.2.19.2. Products
- 6.2.19.3. SWOT Analysis
- 6.2.19.4. Recent Developments
- 6.2.19.5. Financials (Based on Availability)
- 6.2.20 Alfa Laval AB
- 6.2.20.1. Overview
- 6.2.20.2. Products
- 6.2.20.3. SWOT Analysis
- 6.2.20.4. Recent Developments
- 6.2.20.5. Financials (Based on Availability)
- 6.2.21 M+W Group (Exyte)
- 6.2.21.1. Overview
- 6.2.21.2. Products
- 6.2.21.3. SWOT Analysis
- 6.2.21.4. Recent Developments
- 6.2.21.5. Financials (Based on Availability)
- 6.2.1 ABB Ltd
List of Figures
- Figure 1: Israel Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Israel Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Israel Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Israel Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Israel Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Israel Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Israel Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Israel Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Israel Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Israel Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Israel Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Israel Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Israel Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Israel Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Israel Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 14: Israel Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 15: Israel Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 16: Israel Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Israel Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Israel Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Israel Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Israel Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Israel Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Israel Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 23: Israel Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 24: Israel Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 25: Israel Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 26: Israel Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 27: Israel Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 28: Israel Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 29: Israel Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 30: Israel Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 31: Israel Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 32: Israel Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 33: Israel Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 34: Israel Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 35: Israel Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 36: Israel Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 37: Israel Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 38: Israel Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 39: Israel Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 40: Israel Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 41: Israel Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 42: Israel Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 43: Israel Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 44: Israel Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Israel Data Center Construction Market?
The projected CAGR is approximately 9.55%.
2. Which companies are prominent players in the Israel Data Center Construction Market?
Key companies in the market include ABB Ltd, Fortis Construction, STULZ GMBH, Saan Zahav, Delta Group, Schneider Electric SE, Turner Construction Co, DPR Construction Inc, Caterpillar Inc, Rittal GmbH & Co KG, Delta Electronics, STULZ GMB, Mercury Engineering, AECOM Limited, Legrand, CyrusOne Inc, AECOM, Canovate Group, EAE Group, Alfa Laval AB, M+W Group (Exyte).
3. What are the main segments of the Israel Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
9.1 Rising Adoption of Renewable Energy Sources9.2 Increase in 5G Deployments Fueling Edge Data Center Investments9.3 Smart City Initiatives Driving Data Center Investments.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
10.1 Security Challenges in Data Centers10.2 Location Constraints on the Development of Data Centers.
8. Can you provide examples of recent developments in the market?
July 2022: Berkshire Partners announced to pay more than USD 215 million to acquire a 49% stake in MedOne. The company was evaluated at NIS 1.5 billion (USD 430 Million).
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Israel Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Israel Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Israel Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Israel Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence