Key Insights
The United Kingdom data center construction market is experiencing robust growth, driven by increasing digitalization, the burgeoning cloud computing sector, and the rising demand for high-performance computing (HPC) resources. The market's Compound Annual Growth Rate (CAGR) of 5.05% from 2019 to 2024 indicates a consistent upward trajectory. This growth is further fueled by government initiatives promoting digital infrastructure and the expansion of 5G networks, necessitating substantial investments in data center capacity. Significant expansion is expected within the segments encompassing large and mega data centers, reflecting the needs of hyperscale providers and major enterprises. The demand for advanced cooling infrastructure, including evaporative cooling systems, is also a key driver, reflecting the need for energy-efficient and reliable operations. The presence of established players like Schneider Electric, HPE, and IBM, alongside specialized construction firms like Clune Construction and DPR Construction, underscores the market's maturity and the potential for further consolidation. Challenges, however, include securing sufficient land and power supplies, navigating complex planning permissions, and ensuring a skilled workforce to meet the rising construction demands.
The forecast period of 2025-2033 projects continued expansion, with the market likely experiencing accelerated growth due to heightened investment in edge computing and the increasing focus on data sovereignty and resilience. The UK's strong financial sector and its position as a significant European tech hub will continue to be key factors driving market growth. Segmentation analysis indicates that the IT & Telecommunication sector will remain a dominant end-user, while the growth of the BFSI and government sectors will create further opportunities. The Tier 1 and Tier 2 data center segments are likely to witness the highest growth rates due to the concentration of large-scale deployments in major urban areas. The ongoing development of innovative cooling technologies and sustainable construction practices will shape the market's competitive landscape, influencing the choice of vendors and contractors for future projects.

United Kingdom Data Center Construction Market: A Comprehensive Report (2019-2033)
This in-depth report provides a comprehensive analysis of the United Kingdom data center construction market, offering invaluable insights for stakeholders across the industry. With a study period spanning 2019-2033, a base year of 2025, and a forecast period of 2025-2033, this report unveils the market's current state, future trajectory, and key growth drivers. We delve into market size, CAGR, segment performance, leading players, and emerging trends, delivering actionable intelligence to support strategic decision-making. The report also incorporates crucial industry developments, highlighting significant projects and market shifts.
United Kingdom Data Center Construction Market Market Concentration & Dynamics
The UK data center construction market exhibits a moderately concentrated landscape, with a handful of major players holding significant market share. However, a dynamic competitive environment fosters innovation and strategic partnerships. The market's evolution is shaped by stringent regulatory frameworks focused on sustainability and data security. Substitute products, like cloud computing, pose competitive pressures but also contribute to the overall growth of data center infrastructure. End-user trends lean towards higher tiers (Tier 3 and above) and larger data center footprints (Mega and Massive), particularly in segments like IT & Telecommunication and BFSI. The market has witnessed a notable increase in M&A activity in recent years, with an estimated xx number of deals finalized between 2019 and 2024. This consolidation is expected to further shape market concentration and competitiveness in the coming years.
- Market Share: Top 5 players hold an estimated xx% market share (2024).
- M&A Deal Counts: Approximately xx deals were recorded from 2019-2024.
- Innovation Ecosystem: A robust ecosystem of technology providers, construction firms, and service providers fuels innovation.
- Regulatory Landscape: Stringent regulations related to energy efficiency and data privacy influence market growth.
United Kingdom Data Center Construction Market Industry Insights & Trends
The UK data center construction market is experiencing robust growth, driven by increasing digitalization across all sectors. The market size is estimated at £xx Million in 2025, exhibiting a CAGR of xx% during the forecast period (2025-2033). Key factors driving this expansion include the rising adoption of cloud computing services, the expansion of the 5G network, and the growing demand for data storage and processing capabilities across various industries. Technological advancements, particularly in cooling infrastructure and power management, are optimizing data center efficiency and reducing operational costs. The increasing demand for robust data security and resilience is propelling the construction of high-tier data centers with advanced security features. Shifting consumer behaviors, favoring digital services and online interactions, underscore the enduring demand for sophisticated data center infrastructure. The impact of these trends is visible through the rapid expansion of data center campuses and the growing investment in sustainable data center technologies.

Key Markets & Segments Leading United Kingdom Data Center Construction Market
The London region dominates the UK data center construction market, driven by its robust digital infrastructure and concentration of major businesses. Within segments, the IT & Telecommunication sector accounts for the largest share of data center construction, followed by BFSI. Large and Mega data centers are the most prevalent, reflecting the industry's increasing demand for higher capacity.
- Dominant Regions: London and South East England.
- Leading Segments:
- End-User: IT & Telecommunication, BFSI.
- Tier Type: Tier 3
- Data Center Size: Large, Mega
- Infrastructure: Cooling Infrastructure, Power Distribution Unit (PDU)
- Growth Drivers:
- Increased digital transformation across industries.
- Government initiatives promoting digital infrastructure development.
- Expansion of 5G network infrastructure.
- Growing focus on data security and resilience.
United Kingdom Data Center Construction Market Product Developments
Recent product innovations focus on improving data center efficiency, sustainability, and security. Advancements in cooling technologies (e.g., liquid cooling) and power management systems are optimizing energy consumption. Modular data center designs are gaining popularity, offering scalability and faster deployment. Enhanced physical security measures, including biometric access controls and advanced surveillance systems, are strengthening data center protection. These advancements enhance competitive edges by offering improved operational efficiency, reduced costs, and enhanced security features.
Challenges in the United Kingdom Data Center Construction Market Market
The UK data center construction market faces several challenges. Regulatory hurdles, particularly related to planning permissions and environmental regulations, can delay projects and increase costs. Supply chain disruptions, exacerbated by global events, affect the availability of critical components, impacting project timelines and budgets. Intense competition among data center developers and construction firms puts pressure on pricing and profitability. For example, the increased cost of materials has affected project budgets by an estimated xx% in 2024.
Forces Driving United Kingdom Data Center Construction Market Growth
Several factors drive the growth of the UK data center construction market. Technological advancements like AI and IoT are increasing data volumes, fuelling demand for expanded data center capacity. Economic growth and increased digital adoption across industries create a sustained demand for data center services. Government initiatives supporting digital infrastructure development create a favorable regulatory environment, promoting investment and expansion. The shift towards cloud-based services is a key growth driver.
Challenges in the United Kingdom Data Center Construction Market Market
Long-term growth depends on addressing key challenges. Continued innovation in cooling and power technologies is crucial for enhancing data center efficiency and sustainability. Strategic partnerships between technology providers and construction firms are essential for streamlining project delivery. Expanding into new regions and targeting underserved markets can unlock new growth opportunities.
Emerging Opportunities in United Kingdom Data Center Construction Market
Emerging opportunities include the adoption of edge computing, increasing demand for sustainable data centers, and the development of specialized data centers for AI and machine learning. The growth of hyperscale data centers presents substantial opportunities for construction firms. Investment in data center infrastructure-as-a-service (DCaaS) platforms is poised to expand the market.
Leading Players in the United Kingdom Data Center Construction Market Sector
- Sweco AB
- Honeywell International Inc
- Johnson Controls International PLC
- Alfa Laval Ltd
- Clune Construction Company LP
- IBM Corporation
- Arup Group
- Castrol Limited
- Hewlett Packard Enterprise (HPE)
- Schneider Electric SE
- DPR CONSTRUCTION INC
- Airedale International Air Conditioning
- Datadome Group
- AECOM
- Fortis Construction Inc
- Datacentre UK
Key Milestones in United Kingdom Data Center Construction Market Industry
- August 2022: Colt announced the opening of a new 50MW data center in Hayes, West London, significantly expanding its UK capacity. This demonstrates the ongoing investment in large-scale data center infrastructure.
- October 2022: CyrusOne announced plans for a new 90MW data center in Iver Heath, Buckinghamshire. This signifies the expansion of data center development into new regions of the UK.
Strategic Outlook for United Kingdom Data Center Construction Market Market
The UK data center construction market exhibits strong growth potential, fueled by ongoing digital transformation and the expanding demand for data center services. Strategic opportunities lie in embracing sustainable technologies, developing innovative solutions, and fostering strong partnerships. The market is expected to witness continued consolidation, with larger players acquiring smaller firms to expand their market share. Companies that can adapt to evolving technological trends and regulatory requirements will be well-positioned to capitalize on the market's future growth.
United Kingdom Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low Voltage
- 1.1.1.3.2. Medium Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Back up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Ba
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low Voltage
- 2.1.3.2. Medium Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Distribution Solutions
-
2.2. Power Back up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Ba
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low Voltage
- 3.3.2. Medium Voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Distribution Solutions
-
4. Power Back up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-to-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-row and In-rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-to-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-row and In-rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier-I and-II
- 11.2. Tier-III
- 11.3. Tier-IV
- 12. Tier-I and-II
- 13. Tier-III
- 14. Tier-IV
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
United Kingdom Data Center Construction Market Segmentation By Geography
- 1. United Kingdom

United Kingdom Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 5.05% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
- 3.3. Market Restrains
- 3.3.1. Security Challenges Impacting Growth of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low Voltage
- 5.1.1.1.3.2. Medium Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Back up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Ba
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low Voltage
- 5.2.1.3.2. Medium Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Distribution Solutions
- 5.2.2. Power Back up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Ba
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low Voltage
- 5.3.3.2. Medium Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Distribution Solutions
- 5.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-to-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-row and In-rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-to-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-row and In-rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier-I and-II
- 5.11.2. Tier-III
- 5.11.3. Tier-IV
- 5.12. Market Analysis, Insights and Forecast - by Tier-I and-II
- 5.13. Market Analysis, Insights and Forecast - by Tier-III
- 5.14. Market Analysis, Insights and Forecast - by Tier-IV
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. United Kingdom
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Germany United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 6.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 6.1.1. undefined
- 7. France United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 7.1.1. undefined
- 8. United Kingdom United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 8.1.1. undefined
- 9. Netherlands United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 9.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 9.1.1. undefined
- 10. Ireland United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 10.1.1. undefined
- 11. Switzerland United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 11.1.1. undefined
- 12. Denmark United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 12.1.1. undefined
- 13. Sweden United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 13.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 13.1.1. undefined
- 14. Italy United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 14.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 14.1.1. undefined
- 15. Poland United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 15.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 15.1.1. undefined
- 16. Norway United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 16.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 16.1.1. undefined
- 17. Austria United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 17.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 17.1.1. undefined
- 18. Spain United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 18.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 18.1.1. undefined
- 19. Rest of Europe United Kingdom Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 19.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 19.1.1. undefined
- 20. Competitive Analysis
- 20.1. Market Share Analysis 2024
- 20.2. Company Profiles
- 20.2.1 Sweco AB
- 20.2.1.1. Overview
- 20.2.1.2. Products
- 20.2.1.3. SWOT Analysis
- 20.2.1.4. Recent Developments
- 20.2.1.5. Financials (Based on Availability)
- 20.2.2 Honeywell International Inc
- 20.2.2.1. Overview
- 20.2.2.2. Products
- 20.2.2.3. SWOT Analysis
- 20.2.2.4. Recent Developments
- 20.2.2.5. Financials (Based on Availability)
- 20.2.3 Johnson Controls International PLC
- 20.2.3.1. Overview
- 20.2.3.2. Products
- 20.2.3.3. SWOT Analysis
- 20.2.3.4. Recent Developments
- 20.2.3.5. Financials (Based on Availability)
- 20.2.4 Alfa Laval Ltd
- 20.2.4.1. Overview
- 20.2.4.2. Products
- 20.2.4.3. SWOT Analysis
- 20.2.4.4. Recent Developments
- 20.2.4.5. Financials (Based on Availability)
- 20.2.5 Clune Construction Company LP
- 20.2.5.1. Overview
- 20.2.5.2. Products
- 20.2.5.3. SWOT Analysis
- 20.2.5.4. Recent Developments
- 20.2.5.5. Financials (Based on Availability)
- 20.2.6 IBM Corporation
- 20.2.6.1. Overview
- 20.2.6.2. Products
- 20.2.6.3. SWOT Analysis
- 20.2.6.4. Recent Developments
- 20.2.6.5. Financials (Based on Availability)
- 20.2.7 Arup Group
- 20.2.7.1. Overview
- 20.2.7.2. Products
- 20.2.7.3. SWOT Analysis
- 20.2.7.4. Recent Developments
- 20.2.7.5. Financials (Based on Availability)
- 20.2.8 Castrol Limited
- 20.2.8.1. Overview
- 20.2.8.2. Products
- 20.2.8.3. SWOT Analysis
- 20.2.8.4. Recent Developments
- 20.2.8.5. Financials (Based on Availability)
- 20.2.9 Hewlett Packard Enterprise (HPE)
- 20.2.9.1. Overview
- 20.2.9.2. Products
- 20.2.9.3. SWOT Analysis
- 20.2.9.4. Recent Developments
- 20.2.9.5. Financials (Based on Availability)
- 20.2.10 Schneider Electric SE
- 20.2.10.1. Overview
- 20.2.10.2. Products
- 20.2.10.3. SWOT Analysis
- 20.2.10.4. Recent Developments
- 20.2.10.5. Financials (Based on Availability)
- 20.2.11 DPR CONSTRUCTION INC
- 20.2.11.1. Overview
- 20.2.11.2. Products
- 20.2.11.3. SWOT Analysis
- 20.2.11.4. Recent Developments
- 20.2.11.5. Financials (Based on Availability)
- 20.2.12 Airedale International Air Conditioning
- 20.2.12.1. Overview
- 20.2.12.2. Products
- 20.2.12.3. SWOT Analysis
- 20.2.12.4. Recent Developments
- 20.2.12.5. Financials (Based on Availability)
- 20.2.13 Datadome Group
- 20.2.13.1. Overview
- 20.2.13.2. Products
- 20.2.13.3. SWOT Analysis
- 20.2.13.4. Recent Developments
- 20.2.13.5. Financials (Based on Availability)
- 20.2.14 AECOM
- 20.2.14.1. Overview
- 20.2.14.2. Products
- 20.2.14.3. SWOT Analysis
- 20.2.14.4. Recent Developments
- 20.2.14.5. Financials (Based on Availability)
- 20.2.15 Fortis ConstructionInc
- 20.2.15.1. Overview
- 20.2.15.2. Products
- 20.2.15.3. SWOT Analysis
- 20.2.15.4. Recent Developments
- 20.2.15.5. Financials (Based on Availability)
- 20.2.16 Datacentre UK
- 20.2.16.1. Overview
- 20.2.16.2. Products
- 20.2.16.3. SWOT Analysis
- 20.2.16.4. Recent Developments
- 20.2.16.5. Financials (Based on Availability)
- 20.2.1 Sweco AB
List of Figures
- Figure 1: United Kingdom Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: United Kingdom Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: United Kingdom Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: United Kingdom Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: United Kingdom Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: United Kingdom Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: United Kingdom Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 10: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 11: United Kingdom Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: United Kingdom Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: United Kingdom Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: United Kingdom Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 18: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 19: United Kingdom Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 20: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 21: United Kingdom Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 22: United Kingdom Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 23: United Kingdom Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 24: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 25: United Kingdom Data Center Construction Market Revenue Million Forecast, by Tier-I and-II 2019 & 2032
- Table 26: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Tier-I and-II 2019 & 2032
- Table 27: United Kingdom Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 28: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 29: United Kingdom Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 30: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 31: United Kingdom Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 32: United Kingdom Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 33: United Kingdom Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 34: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 35: United Kingdom Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 36: United Kingdom Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 37: United Kingdom Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 38: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 39: United Kingdom Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 40: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 41: United Kingdom Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 42: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 43: United Kingdom Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 44: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 45: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 46: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 47: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 48: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 49: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 50: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 51: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 52: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 53: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 54: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 55: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 56: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 57: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 58: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 59: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 60: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 61: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 62: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 63: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 64: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 65: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 66: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 67: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 68: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 69: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 70: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 71: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 72: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 73: United Kingdom Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 74: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 75: United Kingdom Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 76: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 77: United Kingdom Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 78: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 79: United Kingdom Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 80: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 81: United Kingdom Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 82: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 83: United Kingdom Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 84: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 85: United Kingdom Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 86: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 87: United Kingdom Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 88: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 89: United Kingdom Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 90: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 91: United Kingdom Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 92: United Kingdom Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 93: United Kingdom Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 94: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 95: United Kingdom Data Center Construction Market Revenue Million Forecast, by Tier-I and-II 2019 & 2032
- Table 96: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Tier-I and-II 2019 & 2032
- Table 97: United Kingdom Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 98: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 99: United Kingdom Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 100: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 101: United Kingdom Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 102: United Kingdom Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 103: United Kingdom Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 104: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 105: United Kingdom Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 106: United Kingdom Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 107: United Kingdom Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 108: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 109: United Kingdom Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 110: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 111: United Kingdom Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 112: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 113: United Kingdom Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 114: United Kingdom Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the United Kingdom Data Center Construction Market?
The projected CAGR is approximately 5.05%.
2. Which companies are prominent players in the United Kingdom Data Center Construction Market?
Key companies in the market include Sweco AB, Honeywell International Inc, Johnson Controls International PLC, Alfa Laval Ltd, Clune Construction Company LP, IBM Corporation, Arup Group, Castrol Limited, Hewlett Packard Enterprise (HPE), Schneider Electric SE, DPR CONSTRUCTION INC, Airedale International Air Conditioning, Datadome Group, AECOM, Fortis ConstructionInc, Datacentre UK.
3. What are the main segments of the United Kingdom Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back up Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier-I and-II, Tier-III, Tier-IV, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
Security Challenges Impacting Growth of Data Centers.
8. Can you provide examples of recent developments in the market?
October 2022: CyrusOne announced that they proposed a new data center in Iver Heath, Buckinghamshire, UK. The site will have 10 data halls supporting around 90MW of capacity, and the project would include a new on-site substation.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "United Kingdom Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the United Kingdom Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the United Kingdom Data Center Construction Market?
To stay informed about further developments, trends, and reports in the United Kingdom Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence