Key Insights
The Denmark data center construction market is experiencing robust growth, driven by increasing digitalization, cloud adoption, and the burgeoning need for robust IT infrastructure. The market, estimated at [Insert reasonable market size for 2025 based on CAGR and available data, e.g., 150 million USD], is projected to maintain a Compound Annual Growth Rate (CAGR) of 12.44% from 2025 to 2033. Key drivers include government initiatives promoting digital transformation, the expansion of 5G networks, and the growing demand for data storage and processing from sectors such as IT & Telecommunications, BFSI (Banking, Financial Services, and Insurance), and Healthcare. The market is segmented by tier type (Tier 1, Tier 2, Tier 3, etc.), data center size (small, medium, large, mega, massive), infrastructure components (cooling, power, racks, servers, networking, security, design services), and end-user industries. The large segment sizes and high growth potential suggest considerable opportunities for companies like Aarsleff, Johnson Controls, Caverion, and others operating in design, construction, and infrastructure provision.
Significant trends shaping the market include the increasing adoption of sustainable and energy-efficient data center designs, the rise of hyperscale data centers, and the growing focus on edge computing deployments. While the market presents substantial opportunities, potential restraints include high initial investment costs associated with data center construction, stringent regulatory compliance requirements, and the need for skilled labor. The dominance of Tier 1 and large data centers, combined with the expanding presence of hyperscalers, suggests a continued focus on large-scale projects with substantial financial investment and advanced technological integration. The forecast period (2025-2033) paints a picture of continued expansion within the Danish market, driven by both domestic and international investment in digital infrastructure.

Denmark Data Center Construction Market: 2019-2033 Report
This comprehensive report provides an in-depth analysis of the Denmark data center construction market, offering invaluable insights for stakeholders across the value chain. Covering the period 2019-2033, with a focus on 2025, this report examines market dynamics, key segments, leading players, and future growth opportunities. The report uses data from the historical period (2019-2024), base year (2025), and estimated year (2025) to project the market's trajectory until 2033. Expect detailed breakdowns of market size in Millions, CAGR calculations, and analysis of key trends impacting this rapidly evolving sector.
Denmark Data Center Construction Market Market Concentration & Dynamics
The Denmark data center construction market exhibits a moderately concentrated landscape, with several multinational players holding significant market share. Market concentration is influenced by factors such as the presence of established players, the scale of investments required, and regulatory frameworks. Innovation within the sector is driven by advancements in cooling technologies, power efficiency solutions, and sustainable practices. The regulatory environment, while supportive of data center development, also includes guidelines on energy consumption and environmental impact. Substitute products, while limited, include cloud computing services that can sometimes reduce the need for on-premises data centers.
End-user trends heavily favor hyperscale data center deployments, driven by the rising demand for cloud services and big data analytics. This shift is impacting the size of data centers being built, with a clear inclination towards larger facilities. Mergers and acquisitions (M&A) activity remains a significant factor shaping the market landscape. Over the past five years, the number of M&A deals has averaged xx per year, resulting in a xx% increase in market consolidation.
Denmark Data Center Construction Market Industry Insights & Trends
The Denmark data center construction market is witnessing robust growth, driven by the increasing demand for digital services across various sectors. The market size in 2025 is estimated at xx Million, demonstrating a Compound Annual Growth Rate (CAGR) of xx% during the historical period (2019-2024). This growth is fueled by several factors:
- Rising digitalization: The increasing adoption of cloud computing, IoT, and big data analytics is driving the need for more advanced data center infrastructure.
- Government initiatives: Government support for digital transformation and investments in digital infrastructure are stimulating the market.
- Expansion of 5G networks: The rollout of 5G networks is anticipated to further increase data traffic, necessitating enhanced data center capacity.
- Focus on sustainability: Growing awareness of environmental concerns is pushing for more sustainable data center designs and operations.
Technological disruptions are shaping the market with advancements in areas such as AI-powered cooling systems, energy-efficient hardware, and improved security technologies. Consumer behavior is shifting towards greater demand for speed, reliability, and security in data storage and processing, demanding cutting-edge infrastructure.

Key Markets & Segments Leading Denmark Data Center Construction Market
The Denmark data center construction market is characterized by a strong focus on Tier III and Tier IV data centers, reflecting the demand for high availability and redundancy. Larger data centers (Mega and Massive) are gaining traction, driven by hyperscale deployments.
Drivers:
- Economic Growth: Denmark's strong economy provides a stable environment for data center investments.
- Robust Digital Infrastructure: Existing robust telecommunications infrastructure provides a solid foundation.
- Government Support: Supportive government policies promote data center development.
- Energy Availability: Denmark's commitment to renewable energy ensures a sustainable power supply.
Dominance Analysis:
The IT & Telecommunication sector is the leading end-user, accounting for xx% of the market share in 2025. The BFSI and Government sectors are also significant contributors, further driving demand. In terms of infrastructure, the cooling and power infrastructure segments hold the largest market share due to the critical role they play in data center operations.
Denmark Data Center Construction Market Product Developments
Recent product innovations include AI-driven cooling solutions that optimize energy efficiency, advanced security systems incorporating biometrics and AI, and modular data center designs that allow for faster and more flexible deployments. These advancements enhance operational efficiency, reduce environmental impact, and improve security, giving companies a competitive edge in attracting clients requiring reliable and cost-effective solutions.
Challenges in the Denmark Data Center Construction Market Market
The Denmark data center construction market faces challenges such as securing sufficient land for large-scale deployments, ensuring a stable power supply to meet growing energy demands, and navigating complex regulatory processes. Competition from established international players also poses a considerable challenge, requiring new entrants to differentiate their offerings through innovation and strategic partnerships. The impact of these challenges is estimated to reduce the market growth by xx% by 2033.
Forces Driving Denmark Data Center Construction Market Growth
Key growth drivers include increasing digitalization across various sectors, the rise of cloud computing and big data, government initiatives promoting digital transformation, and the increasing need for secure and reliable data storage solutions. The ongoing expansion of 5G networks will further intensify the demand for advanced data center infrastructure in the coming years.
Long-Term Growth Catalysts in Denmark Data Center Construction Market
Long-term growth will be propelled by continuous technological innovations, strategic partnerships between data center developers and technology providers, and expansion into new geographic markets within Denmark. The focus on sustainable and energy-efficient solutions will also drive market expansion.
Emerging Opportunities in Denmark Data Center Construction Market
Emerging opportunities lie in the development of edge data centers to support the growing needs of IoT and 5G applications, the adoption of modular and prefabricated data center designs, and the expansion of data center services to cater to specific industries like healthcare and finance.
Leading Players in the Denmark Data Center Construction Market Sector
- Per Aarsleff A/S
- Johnson Controls International PLC (Johnson Controls)
- Caverion Corporation (Caverion)
- IBM Corporation (IBM)
- Legrand SA (Legrand)
- Kohler Co (Kohler)
- Atos Group (Atos)
- Rolls-Royce Power Systems (Rolls-Royce Power Systems)
- NetApp Inc (NetApp)
- Castrol Limited (Castrol)
- Schneider Electric SE (Schneider Electric)
- Arista Networks (Arista Networks)
- DPR CONSTRUCTION INC (DPR Construction)
- Arup Group Limited (Arup)
- AECOM (AECOM)
Key Milestones in Denmark Data Center Construction Market Industry
- June 2021: Penta Infra acquires Sentia Denmark's data center in Glostrup, marking its entry into the Nordic market.
- February 2021: STACK Infrastructure secures land and permits to build a new five-data-center campus in Denmark, signaling significant investment in the region.
Strategic Outlook for Denmark Data Center Construction Market Market
The Denmark data center construction market presents significant growth opportunities, driven by the increasing digitalization of the economy and the need for robust and sustainable data center infrastructure. Strategic partnerships, investments in innovative technologies, and a focus on sustainability will be key to success in this dynamic market. The market is poised for sustained growth, fueled by increasing digital transformation initiatives and the continued expansion of cloud services.
Denmark Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Others
-
1.1.2. Power Back-up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. By Electrical Infrastructure
-
2. Tier Type
- 2.1. Tier 1 and 2
- 2.2. Tier 3
- 2.3. Tier 4
-
3. End User
- 3.1. Banking, Financial Services, and Insurance
- 3.2. IT and Telecommunications
- 3.3. Government and Defense
- 3.4. Healthcare
- 3.5. Other End Users
Denmark Data Center Construction Market Segmentation By Geography
- 1. Denmark

Denmark Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 12.44% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
- 3.3. Market Restrains
- 3.3.1. Security Challenges Impacting Growth of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Denmark Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Others
- 5.1.1.2. Power Back-up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Tier Type
- 5.2.1. Tier 1 and 2
- 5.2.2. Tier 3
- 5.2.3. Tier 4
- 5.3. Market Analysis, Insights and Forecast - by End User
- 5.3.1. Banking, Financial Services, and Insurance
- 5.3.2. IT and Telecommunications
- 5.3.3. Government and Defense
- 5.3.4. Healthcare
- 5.3.5. Other End Users
- 5.4. Market Analysis, Insights and Forecast - by Region
- 5.4.1. Denmark
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Per Aarsleff A/S
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Johnson Controls International PLC
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Caverion Corporation
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 IBM Corporation
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 Legrand SA
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Kohler Co
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Atos Group
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 Rolls-Royce Power Systems
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 NetApp Inc
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Castrol Limited
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Schneider Electric SE
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Arista Networks
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 DPR CONSTRUCTION INC
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 Arup Group Limited
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 AECOM
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.1 Per Aarsleff A/S
List of Figures
- Figure 1: Denmark Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Denmark Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Denmark Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Denmark Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: Denmark Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: Denmark Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: Denmark Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 6: Denmark Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 7: Denmark Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 8: Denmark Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 9: Denmark Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 10: Denmark Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 11: Denmark Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 12: Denmark Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 13: Denmark Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 14: Denmark Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 15: Denmark Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 16: Denmark Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 17: Denmark Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 18: Denmark Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 19: Denmark Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 20: Denmark Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Denmark Data Center Construction Market?
The projected CAGR is approximately 12.44%.
2. Which companies are prominent players in the Denmark Data Center Construction Market?
Key companies in the market include Per Aarsleff A/S, Johnson Controls International PLC, Caverion Corporation, IBM Corporation, Legrand SA, Kohler Co, Atos Group, Rolls-Royce Power Systems, NetApp Inc , Castrol Limited, Schneider Electric SE, Arista Networks, DPR CONSTRUCTION INC, Arup Group Limited, AECOM.
3. What are the main segments of the Denmark Data Center Construction Market?
The market segments include Infrastructure, Tier Type, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
Security Challenges Impacting Growth of Data Centers.
8. Can you provide examples of recent developments in the market?
June 2021: Sentia Denmark's data center in Glostrup was acquired by European data center provider Penta Infra. The acquisition of Sentia Danmark's data centers is Penta Infra's first step toward entering the Nordic market. Penta Infra currently manages a number of data centers in the Netherlands and Germany.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Denmark Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Denmark Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Denmark Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Denmark Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence