Key Insights
The South American data center construction market is experiencing robust growth, driven by increasing digitalization across various sectors, particularly IT & telecommunications, BFSI (Banking, Financial Services, and Insurance), and government. The market's Compound Annual Growth Rate (CAGR) of 11.90% from 2019 to 2024 indicates significant expansion, projected to continue through 2033. This growth is fueled by the rising demand for cloud services, big data analytics, and the expanding e-commerce landscape. Key trends include the adoption of sustainable and energy-efficient data center designs, a focus on hyperscale facilities, and an increasing need for robust physical security infrastructure. While factors like economic volatility and regulatory hurdles pose potential restraints, the overall outlook remains positive. Brazil, as the largest economy in South America, holds the most significant market share, followed by Argentina and other countries in the region. The market is segmented by infrastructure type (power, cooling, etc.), end-user sectors, data center tier levels (Tier 1-4), and size (small to massive). The presence of major global players and local construction firms indicates a competitive yet dynamic market. Significant investment in infrastructure, coupled with government initiatives supporting digital transformation, will further propel market expansion. The ongoing expansion of the region's digital infrastructure necessitates advanced cooling solutions, such as evaporative cooling, to address the climatic conditions and reduce operational costs. This makes the cooling infrastructure segment a key contributor to market growth.
The competitive landscape is characterized by a mix of international and domestic companies, ranging from construction firms like Ascenty Data Centers, Constructora Sudamericana, and Equinix to technology providers such as NetApp, Oracle, and Pure Storage. These companies are strategically investing in building and expanding data centers to meet the surging demand. The market's future growth depends on continued investment in digital infrastructure, favorable government policies, and addressing potential challenges associated with regulatory frameworks and economic stability within the region. The focus on sustainability and the adoption of innovative technologies are also critical factors influencing the trajectory of this rapidly developing market. Continued growth across all segments, especially in mega and massive data centers, points to a promising future for South American data center construction.

South America Data Center Construction Market: A Comprehensive Report (2019-2033)
This in-depth report provides a comprehensive analysis of the South America data center construction market, covering market size, segmentation, key players, growth drivers, challenges, and future outlook. The study period spans from 2019 to 2033, with a focus on the forecast period of 2025-2033 and a base year of 2025. This report is essential for investors, industry stakeholders, and businesses seeking to understand and capitalize on the burgeoning opportunities within this dynamic market. The market is projected to reach xx Million by 2033, exhibiting a CAGR of xx% during the forecast period.
South America Data Center Construction Market Market Concentration & Dynamics
The South America data center construction market exhibits a moderately concentrated landscape, with key players such as Ascenty Data Centers, Equinix Inc., and others holding significant market share. However, the market also presents opportunities for smaller, specialized firms focusing on niche segments. Innovation is driven by increasing demand for higher-tier data centers, coupled with advancements in cooling technologies and sustainable infrastructure solutions. Regulatory frameworks vary across countries, influencing investment decisions and project timelines. Substitute products, like cloud computing services, exert some competitive pressure, yet the need for on-premises data centers for specific applications remains robust. M&A activity is moderate, with several significant deals shaping the competitive landscape.
- Market Concentration: The top 5 players hold an estimated xx% market share in 2025.
- M&A Activity: An estimated xx M&A deals occurred in the historical period (2019-2024).
- Innovation: Focus on sustainable data centers, including evaporative cooling and improved power efficiency.
- End-User Trends: Growing demand from IT & Telecommunication, BFSI, and Government sectors.
South America Data Center Construction Market Industry Insights & Trends
The South America data center construction market is experiencing significant growth, driven by factors such as increasing digitalization, expanding cloud adoption, and the rise of hyperscale data centers. The market size reached xx Million in 2024 and is projected to grow to xx Million by 2033, reflecting a CAGR of xx%. This robust growth trajectory is fueled by substantial investments in IT infrastructure, particularly in Brazil, which currently dominates the market. Technological disruptions, such as the implementation of AI and IoT, are further driving demand for advanced data center solutions. Evolving consumer behavior, with a greater reliance on digital services, is solidifying the need for expanded data center capacity. The market faces some challenges, including economic volatility in certain regions and limitations in local skilled labor, which may impact project timelines and costs. However, overall market sentiment remains positive, indicating strong long-term growth prospects.

Key Markets & Segments Leading South America Data Center Construction Market
Brazil currently leads the South America data center construction market, followed by Chile and Colombia. The rapid growth of the IT and Telecommunication sector, along with the expansion of cloud services, are significant drivers in these key markets. Significant segments driving growth include:
Key Growth Drivers:
- Economic Growth: Expanding economies in major South American countries are fueling investment in data centers.
- Government Initiatives: Policies promoting digital transformation and technological advancement are supporting market expansion.
- Increased Cloud Adoption: Growing demand for cloud services is driving the need for robust data center infrastructure.
- Hyperscale Data Center Development: Major cloud providers are building large-scale data centers in the region.
Dominant Segments:
- End-User: The IT & Telecommunication sector dominates, followed by BFSI and Government.
- Tier Type: There is increasing demand for Tier III and Tier IV data centers, driven by hyperscale deployments and stringent reliability requirements.
- Data Center Size: The market is witnessing a notable increase in the construction of large and mega data centers.
- Infrastructure: Cooling infrastructure, particularly evaporative cooling solutions, and power infrastructure are key segments.
South America Data Center Construction Market Product Developments
Recent product developments in the South America data center construction market focus on modular design, prefabricated components, and sustainable infrastructure solutions. This emphasizes speed of deployment, cost-effectiveness, and reduced environmental impact. Advancements in cooling technologies, such as liquid cooling and improved power distribution units (PDUs), are also contributing to enhanced efficiency and energy savings. These advancements provide a competitive edge for companies offering innovative and sustainable data center solutions.
Challenges in the South America Data Center Construction Market Market
The South America data center construction market faces several challenges, including regulatory complexities that vary across countries, potentially leading to project delays and increased costs. Supply chain disruptions, particularly impacting specialized equipment, can also cause project setbacks. Additionally, intense competition amongst established and emerging players creates pressure on pricing and profitability margins. These factors can collectively impact the overall market growth rate.
Forces Driving South America Data Center Construction Market Growth
Several factors are driving growth in the South America data center construction market. Technological advancements in data center technologies improve efficiency and reduce costs. The robust growth of the digital economy in South America, fueled by increased internet penetration and mobile adoption, is driving the demand for data centers. Supportive government policies, including initiatives to improve digital infrastructure, further stimulate market expansion.
Long-Term Growth Catalysts in South America Data Center Construction Market
Long-term growth in the South America data center construction market will be fueled by continued innovation in sustainable technologies, strategic partnerships between data center developers and technology providers, and expansion into new, less-developed markets within the region. These factors will contribute to increased capacity and improved infrastructure reliability.
Emerging Opportunities in South America Data Center Construction Market
Emerging opportunities include the growing adoption of edge computing, necessitating the construction of smaller, geographically distributed data centers. The increasing demand for high-performance computing (HPC) solutions is driving the need for specialized data centers equipped to handle intensive workloads. Furthermore, the focus on sustainability presents opportunities for companies specializing in green data center designs and technologies.
Leading Players in the South America Data Center Construction Market Sector
- Ascenty Data Centers E Telecomunicacoes
- Constructora Sudamericana S A
- Fortis Construction
- Equinix Inc
- Nakano Corporation
- Aceco TI
- Delta Group
- Turner Construction Co
- ZFB Group
- DPR Construction Inc
- Pure Storage Inc
- NetApp Inc
- Oracle Corporation
- HostDime Brasil
- AECOM Limited
- Legrand
- CyrusOne Inc
- RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG)
Key Milestones in South America Data Center Construction Market Industry
- November 2022: Ascenty announces the construction of five new data centers in Brazil, Chile, Mexico, and Colombia, significantly expanding its capacity and market presence. This demonstrates the continued investment in and growth of the South American data center market.
- August 2022: Scala Data Centers launches the largest vertical data center in Latin America, showcasing advancements in sustainable and hyperscale data center design. This highlights the innovative capacity within the market.
Strategic Outlook for South America Data Center Construction Market Market
The South America data center construction market presents significant future potential, driven by ongoing digital transformation, growing cloud adoption, and the increasing demand for reliable and sustainable infrastructure. Strategic opportunities exist for companies that can offer innovative, cost-effective, and environmentally responsible solutions. The market's long-term growth trajectory remains positive, indicating attractive prospects for investors and businesses operating in this sector.
South America Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Back-up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Distribution Solutions
-
2.2. Power Back-up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Distribution Solutions
-
4. Power Back-up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier-I and II
- 11.2. Tier-III
- 11.3. Tier-IV
- 12. Tier-I and II
- 13. Tier-III
- 14. Tier-IV
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
-
21. Geography
- 21.1. Brazil
- 21.2. Chile
- 21.3. Rest of South America
- 22. Brazil
- 23. Chile
- 24. Rest of South America
South America Data Center Construction Market Segmentation By Geography
- 1. Brazil
- 2. Chile
- 3. Rest of South America

South America Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 11.90% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Growth in Network Connectivity and Increased Adoption of Digital Transformation Related Technologies in the Region; Favorable tax Incentive Structure Introduced by Local Governments has Led to the Higher Participation from International Players; Ongoing Consolidation Efforts by Major Data Center Construction Companies to Aid their Expansion Activities; Growing Awareness on Modular Deployments and Increasing Rack Density
- 3.3. Market Restrains
- 3.3.1. Cost and Infrastructural Concerns Continue to be a Concern; Workforce-Related Challenges
- 3.4. Market Trends
- 3.4.1. End User Outlook
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. South America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Back-up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Distribution Solutions
- 5.2.2. Power Back-up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Distribution Solutions
- 5.4. Market Analysis, Insights and Forecast - by Power Back-up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier-I and II
- 5.11.2. Tier-III
- 5.11.3. Tier-IV
- 5.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 5.13. Market Analysis, Insights and Forecast - by Tier-III
- 5.14. Market Analysis, Insights and Forecast - by Tier-IV
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Geography
- 5.21.1. Brazil
- 5.21.2. Chile
- 5.21.3. Rest of South America
- 5.22. Market Analysis, Insights and Forecast - by Brazil
- 5.23. Market Analysis, Insights and Forecast - by Chile
- 5.24. Market Analysis, Insights and Forecast - by Rest of South America
- 5.25. Market Analysis, Insights and Forecast - by Region
- 5.25.1. Brazil
- 5.25.2. Chile
- 5.25.3. Rest of South America
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Brazil South America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.1.1.1. Power Distribution Solution
- 6.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.1.1.1.2. Transfer Switches
- 6.1.1.1.2.1. Static
- 6.1.1.1.2.2. Automatic (ATS)
- 6.1.1.1.3. Switchgear
- 6.1.1.1.3.1. Low-Voltage
- 6.1.1.1.3.2. Medium-Voltage
- 6.1.1.1.4. Power Panels and Components
- 6.1.1.1.5. Other Power Distribution Solutions
- 6.1.1.2. Power Back-up Solutions
- 6.1.1.2.1. UPS
- 6.1.1.2.2. Generators
- 6.1.1.3. Service
- 6.1.1.1. Power Distribution Solution
- 6.1.2. Market Segmentation - By Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.2.1.1. Immersion Cooling
- 6.1.2.1.2. Direct-To-Chip Cooling
- 6.1.2.1.3. Rear Door Heat Exchanger
- 6.1.2.1.4. In-Row and In-Rack Cooling
- 6.1.2.2. Racks
- 6.1.2.3. Other Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.3. General Construction
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 6.2.1. Power Distribution Solution
- 6.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.2.1.2. Transfer Switches
- 6.2.1.2.1. Static
- 6.2.1.2.2. Automatic (ATS)
- 6.2.1.3. Switchgear
- 6.2.1.3.1. Low-Voltage
- 6.2.1.3.2. Medium-Voltage
- 6.2.1.4. Power Panels and Components
- 6.2.1.5. Other Power Distribution Solutions
- 6.2.2. Power Back-up Solutions
- 6.2.2.1. UPS
- 6.2.2.2. Generators
- 6.2.3. Service
- 6.2.1. Power Distribution Solution
- 6.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 6.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.3.2. Transfer Switches
- 6.3.2.1. Static
- 6.3.2.2. Automatic (ATS)
- 6.3.3. Switchgear
- 6.3.3.1. Low-Voltage
- 6.3.3.2. Medium-Voltage
- 6.3.4. Power Panels and Components
- 6.3.5. Other Power Distribution Solutions
- 6.4. Market Analysis, Insights and Forecast - by Power Back-up Solutions
- 6.4.1. UPS
- 6.4.2. Generators
- 6.5. Market Analysis, Insights and Forecast - by Service
- 6.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.6.1.1. Immersion Cooling
- 6.6.1.2. Direct-To-Chip Cooling
- 6.6.1.3. Rear Door Heat Exchanger
- 6.6.1.4. In-Row and In-Rack Cooling
- 6.6.2. Racks
- 6.6.3. Other Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 6.7.1. Immersion Cooling
- 6.7.2. Direct-To-Chip Cooling
- 6.7.3. Rear Door Heat Exchanger
- 6.7.4. In-Row and In-Rack Cooling
- 6.8. Market Analysis, Insights and Forecast - by Racks
- 6.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 6.10. Market Analysis, Insights and Forecast - by General Construction
- 6.11. Market Analysis, Insights and Forecast - by Tier Type
- 6.11.1. Tier-I and II
- 6.11.2. Tier-III
- 6.11.3. Tier-IV
- 6.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 6.13. Market Analysis, Insights and Forecast - by Tier-III
- 6.14. Market Analysis, Insights and Forecast - by Tier-IV
- 6.15. Market Analysis, Insights and Forecast - by End User
- 6.15.1. Banking, Financial Services, and Insurance
- 6.15.2. IT and Telecommunications
- 6.15.3. Government and Defense
- 6.15.4. Healthcare
- 6.15.5. Other End Users
- 6.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 6.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 6.18. Market Analysis, Insights and Forecast - by Government and Defense
- 6.19. Market Analysis, Insights and Forecast - by Healthcare
- 6.20. Market Analysis, Insights and Forecast - by Other End Users
- 6.21. Market Analysis, Insights and Forecast - by Geography
- 6.21.1. Brazil
- 6.21.2. Chile
- 6.21.3. Rest of South America
- 6.22. Market Analysis, Insights and Forecast - by Brazil
- 6.23. Market Analysis, Insights and Forecast - by Chile
- 6.24. Market Analysis, Insights and Forecast - by Rest of South America
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7. Chile South America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.1.1.1. Power Distribution Solution
- 7.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.1.1.1.2. Transfer Switches
- 7.1.1.1.2.1. Static
- 7.1.1.1.2.2. Automatic (ATS)
- 7.1.1.1.3. Switchgear
- 7.1.1.1.3.1. Low-Voltage
- 7.1.1.1.3.2. Medium-Voltage
- 7.1.1.1.4. Power Panels and Components
- 7.1.1.1.5. Other Power Distribution Solutions
- 7.1.1.2. Power Back-up Solutions
- 7.1.1.2.1. UPS
- 7.1.1.2.2. Generators
- 7.1.1.3. Service
- 7.1.1.1. Power Distribution Solution
- 7.1.2. Market Segmentation - By Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.2.1.1. Immersion Cooling
- 7.1.2.1.2. Direct-To-Chip Cooling
- 7.1.2.1.3. Rear Door Heat Exchanger
- 7.1.2.1.4. In-Row and In-Rack Cooling
- 7.1.2.2. Racks
- 7.1.2.3. Other Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.3. General Construction
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 7.2.1. Power Distribution Solution
- 7.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.2.1.2. Transfer Switches
- 7.2.1.2.1. Static
- 7.2.1.2.2. Automatic (ATS)
- 7.2.1.3. Switchgear
- 7.2.1.3.1. Low-Voltage
- 7.2.1.3.2. Medium-Voltage
- 7.2.1.4. Power Panels and Components
- 7.2.1.5. Other Power Distribution Solutions
- 7.2.2. Power Back-up Solutions
- 7.2.2.1. UPS
- 7.2.2.2. Generators
- 7.2.3. Service
- 7.2.1. Power Distribution Solution
- 7.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 7.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.3.2. Transfer Switches
- 7.3.2.1. Static
- 7.3.2.2. Automatic (ATS)
- 7.3.3. Switchgear
- 7.3.3.1. Low-Voltage
- 7.3.3.2. Medium-Voltage
- 7.3.4. Power Panels and Components
- 7.3.5. Other Power Distribution Solutions
- 7.4. Market Analysis, Insights and Forecast - by Power Back-up Solutions
- 7.4.1. UPS
- 7.4.2. Generators
- 7.5. Market Analysis, Insights and Forecast - by Service
- 7.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.6.1.1. Immersion Cooling
- 7.6.1.2. Direct-To-Chip Cooling
- 7.6.1.3. Rear Door Heat Exchanger
- 7.6.1.4. In-Row and In-Rack Cooling
- 7.6.2. Racks
- 7.6.3. Other Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 7.7.1. Immersion Cooling
- 7.7.2. Direct-To-Chip Cooling
- 7.7.3. Rear Door Heat Exchanger
- 7.7.4. In-Row and In-Rack Cooling
- 7.8. Market Analysis, Insights and Forecast - by Racks
- 7.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 7.10. Market Analysis, Insights and Forecast - by General Construction
- 7.11. Market Analysis, Insights and Forecast - by Tier Type
- 7.11.1. Tier-I and II
- 7.11.2. Tier-III
- 7.11.3. Tier-IV
- 7.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 7.13. Market Analysis, Insights and Forecast - by Tier-III
- 7.14. Market Analysis, Insights and Forecast - by Tier-IV
- 7.15. Market Analysis, Insights and Forecast - by End User
- 7.15.1. Banking, Financial Services, and Insurance
- 7.15.2. IT and Telecommunications
- 7.15.3. Government and Defense
- 7.15.4. Healthcare
- 7.15.5. Other End Users
- 7.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 7.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 7.18. Market Analysis, Insights and Forecast - by Government and Defense
- 7.19. Market Analysis, Insights and Forecast - by Healthcare
- 7.20. Market Analysis, Insights and Forecast - by Other End Users
- 7.21. Market Analysis, Insights and Forecast - by Geography
- 7.21.1. Brazil
- 7.21.2. Chile
- 7.21.3. Rest of South America
- 7.22. Market Analysis, Insights and Forecast - by Brazil
- 7.23. Market Analysis, Insights and Forecast - by Chile
- 7.24. Market Analysis, Insights and Forecast - by Rest of South America
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8. Rest of South America South America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.1.1.1. Power Distribution Solution
- 8.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.1.1.1.2. Transfer Switches
- 8.1.1.1.2.1. Static
- 8.1.1.1.2.2. Automatic (ATS)
- 8.1.1.1.3. Switchgear
- 8.1.1.1.3.1. Low-Voltage
- 8.1.1.1.3.2. Medium-Voltage
- 8.1.1.1.4. Power Panels and Components
- 8.1.1.1.5. Other Power Distribution Solutions
- 8.1.1.2. Power Back-up Solutions
- 8.1.1.2.1. UPS
- 8.1.1.2.2. Generators
- 8.1.1.3. Service
- 8.1.1.1. Power Distribution Solution
- 8.1.2. Market Segmentation - By Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.2.1.1. Immersion Cooling
- 8.1.2.1.2. Direct-To-Chip Cooling
- 8.1.2.1.3. Rear Door Heat Exchanger
- 8.1.2.1.4. In-Row and In-Rack Cooling
- 8.1.2.2. Racks
- 8.1.2.3. Other Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.3. General Construction
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 8.2.1. Power Distribution Solution
- 8.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.2.1.2. Transfer Switches
- 8.2.1.2.1. Static
- 8.2.1.2.2. Automatic (ATS)
- 8.2.1.3. Switchgear
- 8.2.1.3.1. Low-Voltage
- 8.2.1.3.2. Medium-Voltage
- 8.2.1.4. Power Panels and Components
- 8.2.1.5. Other Power Distribution Solutions
- 8.2.2. Power Back-up Solutions
- 8.2.2.1. UPS
- 8.2.2.2. Generators
- 8.2.3. Service
- 8.2.1. Power Distribution Solution
- 8.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 8.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.3.2. Transfer Switches
- 8.3.2.1. Static
- 8.3.2.2. Automatic (ATS)
- 8.3.3. Switchgear
- 8.3.3.1. Low-Voltage
- 8.3.3.2. Medium-Voltage
- 8.3.4. Power Panels and Components
- 8.3.5. Other Power Distribution Solutions
- 8.4. Market Analysis, Insights and Forecast - by Power Back-up Solutions
- 8.4.1. UPS
- 8.4.2. Generators
- 8.5. Market Analysis, Insights and Forecast - by Service
- 8.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.6.1.1. Immersion Cooling
- 8.6.1.2. Direct-To-Chip Cooling
- 8.6.1.3. Rear Door Heat Exchanger
- 8.6.1.4. In-Row and In-Rack Cooling
- 8.6.2. Racks
- 8.6.3. Other Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 8.7.1. Immersion Cooling
- 8.7.2. Direct-To-Chip Cooling
- 8.7.3. Rear Door Heat Exchanger
- 8.7.4. In-Row and In-Rack Cooling
- 8.8. Market Analysis, Insights and Forecast - by Racks
- 8.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 8.10. Market Analysis, Insights and Forecast - by General Construction
- 8.11. Market Analysis, Insights and Forecast - by Tier Type
- 8.11.1. Tier-I and II
- 8.11.2. Tier-III
- 8.11.3. Tier-IV
- 8.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 8.13. Market Analysis, Insights and Forecast - by Tier-III
- 8.14. Market Analysis, Insights and Forecast - by Tier-IV
- 8.15. Market Analysis, Insights and Forecast - by End User
- 8.15.1. Banking, Financial Services, and Insurance
- 8.15.2. IT and Telecommunications
- 8.15.3. Government and Defense
- 8.15.4. Healthcare
- 8.15.5. Other End Users
- 8.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 8.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 8.18. Market Analysis, Insights and Forecast - by Government and Defense
- 8.19. Market Analysis, Insights and Forecast - by Healthcare
- 8.20. Market Analysis, Insights and Forecast - by Other End Users
- 8.21. Market Analysis, Insights and Forecast - by Geography
- 8.21.1. Brazil
- 8.21.2. Chile
- 8.21.3. Rest of South America
- 8.22. Market Analysis, Insights and Forecast - by Brazil
- 8.23. Market Analysis, Insights and Forecast - by Chile
- 8.24. Market Analysis, Insights and Forecast - by Rest of South America
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 9. Brazil South America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Argentina South America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Rest of South America South America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Competitive Analysis
- 12.1. Market Share Analysis 2024
- 12.2. Company Profiles
- 12.2.1 Ascenty Data Centers E Telecomunicacoes
- 12.2.1.1. Overview
- 12.2.1.2. Products
- 12.2.1.3. SWOT Analysis
- 12.2.1.4. Recent Developments
- 12.2.1.5. Financials (Based on Availability)
- 12.2.2 Constructora Sudamericana S A
- 12.2.2.1. Overview
- 12.2.2.2. Products
- 12.2.2.3. SWOT Analysis
- 12.2.2.4. Recent Developments
- 12.2.2.5. Financials (Based on Availability)
- 12.2.3 Fortis Construction
- 12.2.3.1. Overview
- 12.2.3.2. Products
- 12.2.3.3. SWOT Analysis
- 12.2.3.4. Recent Developments
- 12.2.3.5. Financials (Based on Availability)
- 12.2.4 Equinix Inc
- 12.2.4.1. Overview
- 12.2.4.2. Products
- 12.2.4.3. SWOT Analysis
- 12.2.4.4. Recent Developments
- 12.2.4.5. Financials (Based on Availability)
- 12.2.5 Nakano Corporation
- 12.2.5.1. Overview
- 12.2.5.2. Products
- 12.2.5.3. SWOT Analysis
- 12.2.5.4. Recent Developments
- 12.2.5.5. Financials (Based on Availability)
- 12.2.6 Aceco TI
- 12.2.6.1. Overview
- 12.2.6.2. Products
- 12.2.6.3. SWOT Analysis
- 12.2.6.4. Recent Developments
- 12.2.6.5. Financials (Based on Availability)
- 12.2.7 Delta Group
- 12.2.7.1. Overview
- 12.2.7.2. Products
- 12.2.7.3. SWOT Analysis
- 12.2.7.4. Recent Developments
- 12.2.7.5. Financials (Based on Availability)
- 12.2.8 Turner Construction Co
- 12.2.8.1. Overview
- 12.2.8.2. Products
- 12.2.8.3. SWOT Analysis
- 12.2.8.4. Recent Developments
- 12.2.8.5. Financials (Based on Availability)
- 12.2.9 ZFB Group
- 12.2.9.1. Overview
- 12.2.9.2. Products
- 12.2.9.3. SWOT Analysis
- 12.2.9.4. Recent Developments
- 12.2.9.5. Financials (Based on Availability)
- 12.2.10 DPR Construction Inc
- 12.2.10.1. Overview
- 12.2.10.2. Products
- 12.2.10.3. SWOT Analysis
- 12.2.10.4. Recent Developments
- 12.2.10.5. Financials (Based on Availability)
- 12.2.11 Pure Storage Inc *List Not Exhaustive
- 12.2.11.1. Overview
- 12.2.11.2. Products
- 12.2.11.3. SWOT Analysis
- 12.2.11.4. Recent Developments
- 12.2.11.5. Financials (Based on Availability)
- 12.2.12 NetApp Inc
- 12.2.12.1. Overview
- 12.2.12.2. Products
- 12.2.12.3. SWOT Analysis
- 12.2.12.4. Recent Developments
- 12.2.12.5. Financials (Based on Availability)
- 12.2.13 Oracle Corporation
- 12.2.13.1. Overview
- 12.2.13.2. Products
- 12.2.13.3. SWOT Analysis
- 12.2.13.4. Recent Developments
- 12.2.13.5. Financials (Based on Availability)
- 12.2.14 HostDime Brasil
- 12.2.14.1. Overview
- 12.2.14.2. Products
- 12.2.14.3. SWOT Analysis
- 12.2.14.4. Recent Developments
- 12.2.14.5. Financials (Based on Availability)
- 12.2.15 AECOM Limited
- 12.2.15.1. Overview
- 12.2.15.2. Products
- 12.2.15.3. SWOT Analysis
- 12.2.15.4. Recent Developments
- 12.2.15.5. Financials (Based on Availability)
- 12.2.16 Legrand
- 12.2.16.1. Overview
- 12.2.16.2. Products
- 12.2.16.3. SWOT Analysis
- 12.2.16.4. Recent Developments
- 12.2.16.5. Financials (Based on Availability)
- 12.2.17 CyrusOne Inc
- 12.2.17.1. Overview
- 12.2.17.2. Products
- 12.2.17.3. SWOT Analysis
- 12.2.17.4. Recent Developments
- 12.2.17.5. Financials (Based on Availability)
- 12.2.18 RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG)
- 12.2.18.1. Overview
- 12.2.18.2. Products
- 12.2.18.3. SWOT Analysis
- 12.2.18.4. Recent Developments
- 12.2.18.5. Financials (Based on Availability)
- 12.2.1 Ascenty Data Centers E Telecomunicacoes
List of Figures
- Figure 1: South America Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: South America Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: South America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: South America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: South America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: South America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: South America Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 6: South America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: South America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: South America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: South America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: South America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: South America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: South America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: South America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 14: South America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 15: South America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 16: South America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: South America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: South America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: South America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: South America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: South America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: South America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 23: South America Data Center Construction Market Revenue Million Forecast, by Brazil 2019 & 2032
- Table 24: South America Data Center Construction Market Revenue Million Forecast, by Chile 2019 & 2032
- Table 25: South America Data Center Construction Market Revenue Million Forecast, by Rest of South America 2019 & 2032
- Table 26: South America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 27: South America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 28: Brazil South America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 29: Argentina South America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 30: Rest of South America South America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 31: South America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 32: South America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 33: South America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 34: South America Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 35: South America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 36: South America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 37: South America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 38: South America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 39: South America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 40: South America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 41: South America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 42: South America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 43: South America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 44: South America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 45: South America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 46: South America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 47: South America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 48: South America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 49: South America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 50: South America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 51: South America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 52: South America Data Center Construction Market Revenue Million Forecast, by Brazil 2019 & 2032
- Table 53: South America Data Center Construction Market Revenue Million Forecast, by Chile 2019 & 2032
- Table 54: South America Data Center Construction Market Revenue Million Forecast, by Rest of South America 2019 & 2032
- Table 55: South America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 56: South America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 57: South America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 58: South America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 59: South America Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 60: South America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 61: South America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 62: South America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 63: South America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 64: South America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 65: South America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 66: South America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 67: South America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 68: South America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 69: South America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 70: South America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 71: South America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 72: South America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 73: South America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 74: South America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 75: South America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 76: South America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 77: South America Data Center Construction Market Revenue Million Forecast, by Brazil 2019 & 2032
- Table 78: South America Data Center Construction Market Revenue Million Forecast, by Chile 2019 & 2032
- Table 79: South America Data Center Construction Market Revenue Million Forecast, by Rest of South America 2019 & 2032
- Table 80: South America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 81: South America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 82: South America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 83: South America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 84: South America Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 85: South America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 86: South America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 87: South America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 88: South America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 89: South America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 90: South America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 91: South America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 92: South America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 93: South America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 94: South America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 95: South America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 96: South America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 97: South America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 98: South America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 99: South America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 100: South America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 101: South America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 102: South America Data Center Construction Market Revenue Million Forecast, by Brazil 2019 & 2032
- Table 103: South America Data Center Construction Market Revenue Million Forecast, by Chile 2019 & 2032
- Table 104: South America Data Center Construction Market Revenue Million Forecast, by Rest of South America 2019 & 2032
- Table 105: South America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the South America Data Center Construction Market?
The projected CAGR is approximately 11.90%.
2. Which companies are prominent players in the South America Data Center Construction Market?
Key companies in the market include Ascenty Data Centers E Telecomunicacoes, Constructora Sudamericana S A, Fortis Construction, Equinix Inc, Nakano Corporation, Aceco TI, Delta Group, Turner Construction Co, ZFB Group, DPR Construction Inc, Pure Storage Inc *List Not Exhaustive, NetApp Inc, Oracle Corporation, HostDime Brasil, AECOM Limited, Legrand, CyrusOne Inc, RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG).
3. What are the main segments of the South America Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back-up Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier-I and II, Tier-III, Tier-IV, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users, Geography, Brazil, Chile, Rest of South America.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Growth in Network Connectivity and Increased Adoption of Digital Transformation Related Technologies in the Region; Favorable tax Incentive Structure Introduced by Local Governments has Led to the Higher Participation from International Players; Ongoing Consolidation Efforts by Major Data Center Construction Companies to Aid their Expansion Activities; Growing Awareness on Modular Deployments and Increasing Rack Density.
6. What are the notable trends driving market growth?
End User Outlook.
7. Are there any restraints impacting market growth?
Cost and Infrastructural Concerns Continue to be a Concern; Workforce-Related Challenges.
8. Can you provide examples of recent developments in the market?
November 2022: Ascenty, the prevailing market leader in Latin America's data center domain, unveiled its groundbreaking initiative to construct five novel facilities, further cementing its position of preeminence with an aggregate of 33 infrastructures spanning Brazil, Chile, Mexico, and now Colombia. The novel data centers are strategically situated, including Santiago 3, encompassing 21,000 m² with a power capacity of 16 MW; Bogota 1 and 2, each spanning 9,000 m² and equipped with a 12 MW capacity; and finally, So Paulo 5 and 6, boasting an expansive area of 7,000 m² and a commanding capacity of 19 MW each.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 5250, and USD 8750 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "South America Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the South America Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the South America Data Center Construction Market?
To stay informed about further developments, trends, and reports in the South America Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence